The County of Maui is soliciting bids for the complete design‑build of Kelawea Mauka Park Improvements (Job No. P23/007). The scope includes demolition/site clearing, earthwork, grading, trenching, installation of chain‑link fencing and gates, construction of concrete foundations, installation of playground equipment, poured‑in‑place synthetic surfacing, painting, and all associated site utilities and finish work. The contractor must provide labor, materials, tools, transportation, equipment, a bid bond, and comply with prevailing‑wage, insurance, and Hawaii‑resident workforce requirements. Work must be finished within 240 calendar days after a Notice to Proceed, with a mandatory pre‑bid conference (non‑mandatory attendance) on 7 Oct 2026 and a bid submission deadline of 23 Oct 2026.
• Full park renovation – site clearing, earthwork, grading, trenching, back‑filling.
• Installation of chain‑link fence, gates, and site security features.
• Concrete forming, reinforcing, and cast‑in‑place concrete for equipment pads and structures.
• Supply and install playground equipment and related structures.
• Apply poured‑in‑place polyurethane rubber surfacing meeting ASTM F1292, CPSC, and ADA standards.
• Painting, coating, and final site clean‑up.
• Provide warranties (minimum 5 years for surfacing) and submit extensive submittal packages.
• Must meet Hawaii Resident workforce (≥80 %) and prevailing‑wage requirements.
• Project duration: 240 days from Notice to Proceed.
• Award to lowest responsible bidder; bid security = 5 % of bid amount.