The City of Hurst is seeking bids for the West Pipeline Road Improvements, Phase 4 project. The project includes the reconstruction of Pipeline Road from Harrison Lane to Brown Trail, and involves work such as concrete base and pavement, waterline construction, sanitary sewer line construction, storm sewer construction, bridge demolition and construction, street lighting, traffic signal construction, and landscape restoration. The project requires bidders to submit their proposals in a specific format, with prices written in words and numbers, and includes various sections such as paving and drainage, water, sanitary sewer, street lights and irrigation, and bridge and channel improvements.
• The project has a pre-bid meeting scheduled for April 15, 2026, at 11:00 AM EDT, which can be attended in person or virtually.
• The bid submission deadline is May 6, 2026, at 3:00 PM EDT.
• The project includes several addendum items, such as the removal of existing water line pipe and the installation of new water meters.
• Bidders are required to accept certain documents, such as the proposal form and the bid form, as part of their submission.
• The project has a bid opening scheduled for April 29, 2026, at 2:00 PM Central Time, which will be conducted via Zoom.