Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Energy and Utilities
  5. ›RFI No. 3.17.26-POWER-SAL 4.8kV & 12.47kV MOBILE…

LA Water & Power·California

RFI No. 3.17.26-POWER-SAL 4.8kV & 12.47kV MOBILE SUBSTATION WITH ABOVE GROUND ENCLOSED EQUIPMENT

Closes 4/7/2026$1M – $5MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Los Angeles Department of Water and Power (LADWP) is requesting information and feedback from interested parties to assist in obtaining information on various high-voltage mobile substations with above ground enclosed equipment. The RFI aims to survey the industry, determine the level of interest, and gather high-level cost estimates for budget purposes. The project involves the design and construction of a 4.8kV & 12.47kV mobile substation with above ground enclosed equipment. Respondents are asked to provide information on the feasibility of installing equipment on a transportable trailer, trailer-mounted configurations, vibration and shock limitations, seismic design criteria, and safety features. • The mobile substation will be used to maintain reliable electric service to residential and industrial customers affected by the 2025 Palisades fires while infrastructure upgrades are completed for a permanent system. • The proposed mobile substation project is critical for LADWP to accelerate deployment due to long lead times associated with conventional mobile substations. • The RFI is not a competitive solicitation method, and participation is optional. • Respondents are encouraged to submit responses to all or part of the RFI, even if they do not have a current intention to respond to any future RFP or RFQ.

Attached files

Contact

Shaun Larsuel(Utility Buyer)

[email protected]

Key dates

Opened
3/17/2026
Questions due
3/24/2026
Closes
4/7/2026

Last updated

Details

Type
Request for Information
Industry
Energy and Utilities
NAICS
237130
Solicitation №
RFI No. 3.17.26-POWER-SAL

Budget estimate

$1,000,000 – $5,000,000

The budget for this project is difficult to estimate as the RFI does not provide a clear budget or cost range. However, based on the complexity of the project and the fact that it involves the design and construction of a high-voltage mobile substation, the budget could be substantial. The cost of a single mobile substation unit is estimated to be in the range of $500,000 to $2 million, considering the cost of equipment, labor, and materials. The total budget for the project could be in the range of $1 million to $5 million, depending on the number of units required and the scope of the project. The factors that may influence the likely payment range include the complexity of the design, the cost of materials and labor, and the scope of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Maryland

Top match · 71%

IE4 Power RFI

Closes 11/5/2026Opened 10/28/2026

City of Pasadena·California

71% match

Mobile Substation Project

Closes 11/16/2026Opened 9/2/2026

Michigan Department of Technology, Management and Budget – Office of the Chief Technology Officer (OCTO)·Michigan

70% match

OCTO Enhanced Cellular Systems RFI

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·California

70% match

RF Antenna System

Closes 11/4/2026Opened 10/28/2026

Chelan County PUD·Washington

69% match

Mobile Substation Purchase - Mobile 6

Closes 12/17/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

69% match

TriBase Mobile Phone Service RFI

Closes 11/16/2026Opened 10/29/2026

City of Colorado Springs·Colorado

69% match

Cellular Service RFI

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

69% match

Request for Information (RFI) - Local Construction Subcontractors for Spangdahlem AB MACC

Closes 4/30/2027Opened 4/28/2026

U.S. Department Of Defense·California

68% match

Power Amps

Closes 11/5/2026Opened 10/28/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

68% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

U.S. Department Of Defense·California

68% match

61--POWER SUBSTATION,EL

Closes 11/5/2026Opened 10/29/2026

New Jersey Turnpike Authority (Njta)·New Jersey

68% match

RM-204890 RFB Underground Utility Locating and Marking Services

Closes 11/9/2026Opened 10/29/2026

Michigan Department of Technology, Management and Budget – Office of the Chief Technology Officer (OCTO)·Michigan

68% match

OCTO Enhanced Cellular Systems RFI

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of Homeland Security·District of Columbia

68% match

RFI - Tactical Communications and Technical Investigative Comprehensive Solutions (TACTICS): TC1 - Equipment

Closes 11/4/2026Opened 10/28/2026

Michigan Department of Technology, Management and Budget – Office of the Chief Technology Officer (OCTO)·Michigan

68% match

OCTO Enhanced Cellular Systems RFI

Closes 11/12/2026Opened 10/14/2026

Chelan County PUD·Washington

67% match

115 kV Circuit Breakers

Closes 11/5/2026Opened 9/29/2026

Massachusetts Framingham State University·Massachusetts

67% match

RFP-27-01 Public Safety Radio Communication Upgrade

Closes 11/10/2026Opened 10/2/2026

Iowa State University·Iowa

67% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

Alaska Energy Authority·Alaska

67% match

CIPLINK COOK INLET POWER LINK-HVDC PROJECT- RFI

Rolling / TBD closeOpened 10/15/2026

LA County Internal Services Department·California

67% match

Request for Information for Mobile Radios to be used on the LA-RICS LMR System

Rolling / TBD closeOpened 6/12/2025

Los Angeles County·California

67% match

RFI No. LA-RICS 027 - Request for Information for Mobile Radios to be used on the LA-RICS LMR System - Closing: Continuo

Closes 6/16/2027Opened 6/16/2025

Oregon Health and Science University·Oregon

67% match

Courier Management Technology

Rolling / TBD closeOpened 1/13/2020

U.S. Department Of Defense·United States of America

67% match

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

Closes 11/16/2026Opened 10/21/2026

U.S. Department Of Defense·Florida

67% match

FIRE APPARATUS INTERCOM SYSTEM UPLIFT AND INSTALLATION

Closes 9/4/2027Opened 8/24/2026

City of Springfield·Illinois

67% match

Alpha Substation Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026