Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nebraska guideNebraska Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nebraska
  4. ›Construction
  5. ›OPW 55167: Northeast Omaha High-Rate Treatment Basin…

Douglas County·Nebraska

OPW 55167: Northeast Omaha High-Rate Treatment Basin (NEOHRTB) Package 1 - North Downtown Conveyance Sewer (NDCS)

Closes 9/2/2026$20M – $35MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Omaha is soliciting qualified contractors to construct a 1,970‑ft, 72‑inch inside‑diameter combined sewer gravity conduit (micro‑tunneling and hand‑mined) and associated launch and receiving shafts for the Northeast Omaha High‑Rate Treatment Basin (Package 1). The work includes underground excavation, shaft construction, installation of reinforced concrete jack pipe, de‑watering, ground support, and extensive geotechnical monitoring. Bidders must submit an Economic Sustainability Plan, bid bond (or acceptable substitute), and comply with Small & Emerging Small Business (SEB) requirements. A pre‑bid conference is scheduled for 8 Aug 2026 (attendance optional) with a site tour thereafter. The bid window opens 29 Jul 2026 and closes 2 Sep 2026. Successful contractor will receive a Notice to Proceed on 14 Oct 2026. • 1,970 ft of 72‑in. combined sewer via micro‑tunneling & hand‑mining in bedrock • Launch and receiving shafts, temporary and permanent shaft covers • Required submission of Economic Sustainability Plan and optional Apprenticeship Incentive Form • SEB reserve of 3.5 % of total bid; SEB certification info on City website • Bid bond must be a licensed surety or acceptable cash substitute; no letters of credit • Pre‑bid conference 12 Aug 2026 (optional) with virtual Google Meet link • Questions due 23 Aug 2026; answers posted as addenda • NTP anticipated 14 Oct 2026; project duration not defined in the solicitation

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carol Buhr

[email protected]

Key dates

Opened
7/29/2026
Questions due
8/23/2026
Pre-bid meeting
8/12/2026
Closes
9/2/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
CI-2026-0100 Addendum 2

Budget estimate

$20,000,000 – $35,000,000

The solicitation does not disclose a contract value. Based on comparable 72‑inch sewer tunnel projects in the Midwest, a 1,970‑ft micro‑tunneling segment with shaft construction typically ranges from $20 million to $35 million, depending on rock conditions, labor rates, and equipment mobilization. The lower bound assumes minimal geotechnical complications and standard material costs; the upper bound reflects challenging bedrock, extensive de‑watering, and higher labor/equipment premiums.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of North Platte·Nebraska

Top match · 74%

Dewey Street Water

Closes 11/10/2026Opened 10/7/2026

Hastings Utilities·Nebraska

72% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

Hastings Utilities·Nebraska

70% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Douglas County·Nebraska

69% match

OPW 55002: Willa Cather Library HVAC Upgrade

Closes 11/17/2026Opened 10/21/2026

City of Doge City·Kansas

69% match

Red Demon Drive Improvements (due 11/03 @ 1:45pm)

Rolling / TBD closeOpened 9/25/2026

City of Fargo·North Dakota

69% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of West Des Moines·Iowa

69% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

NYS PRIDE of Ticonderoga·New York

69% match

Residential Wastewater Service Laterals and Septic Infrastructure

Closes 11/20/2026Opened 10/29/2026

City of Hattiesburg·Mississippi

69% match

12238 North Main Street Area Infrastructure Improvements - Phase 1 #21158

Closes 11/19/2026Opened 10/16/2026

NYS Niagara Falls, City of·New York

69% match

W2026-02 NFWB – CHEMICALS FOR MUNICIPAL WATER AND WASTE-WATER TREATMENT FACILITIES

Closes 11/10/2026Opened 10/21/2026

Brazos Valley·Texas

68% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Fargo·North Dakota

68% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

New York City Department of Design and Construction·New York

68% match

SE-885 - Trunk Sewer & Outfall at Bergen Basin for the 150th Street Trunk Sewer which shares an Outfall with the GUY R BREWER Trunk sewer

Closes 7/31/2030Opened 7/10/2026

Lower Platte North Natural Resources District·Nebraska

68% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

City of Cincinnati·Ohio

68% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

NYS PRIDE of Ticonderoga·New York

68% match

FULL RESIDENTIAL WELL REPLACEMENT PROJECTS

Closes 11/3/2026Opened 10/13/2026

City of North Olmsted·Ohio

68% match

Sanitary Sewer Rate Study

Closes 11/30/2026Opened 10/27/2026

Lower Platte North Natural Resources District·Nebraska

68% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITES 55 AND 84

Closes 12/2/2026Opened 9/17/2026

Douglas County·Nebraska

68% match

Dump Box, Hydraulics, Plow & Spreader/ Tandem Axle

Closes 11/18/2026Opened 10/28/2026

City of Pearland·Texas

68% match

Scarsdale Boulevard Sewer Extension

Closes 11/4/2026Opened 10/14/2026

Northeast Ohio Regional Sewer District·Ohio

68% match

2027-2030 Industrial Gases

Closes 11/3/2026Opened 10/8/2026

Brazos Valley·Texas

68% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Newberg·Oregon

68% match

NBG Pipe 2026

Closes 11/10/2026Opened 10/20/2026

Texas City of Lubbock·Texas

68% match

ITB 27--YB Hydrochloric Acid for South and North Water Treatment Water

Closes 11/12/2026Opened 10/26/2026

New York City Department of Design and Construction·New York

68% match

SE-885 - Trunk Sewer & Outfall at Bergen Basin for the 150th Street Trunk Sewer which shares an Outfall with the Guy R Brewer Trunk sewer

Closes 7/31/2030Opened 8/5/2026