The State of California, through its Department of Forestry and Fire Protection, is seeking a qualified, CSLB‑licensed general building contractor (Class B) to design‑build a new Parkfield Fire Station complex. The scope includes constructing a four‑bedroom, two‑bay fire‑station building, auxiliary storage, pump, and vehicle‑wash structures, installing a ground‑mounted photovoltaic system, water‑storage tanks, and a fuel‑vault with dispensing equipment, plus associated site grading, utilities, and hazardous‑material remediation. The contract is a lump‑sum award with a 730‑day performance period, requiring a 10 % bid security, 100 % performance and payment bonds, and compliance with prevailing‑wage, DVBE participation, and small‑business preferences.
• New fire‑station building (4 bedrooms, 2 apparatus bays) plus storage, pump, and vehicle‑wash facilities.
• Site improvements: solar PV array, water tanks, fuel‑vault, utilities, grading, and storm‑water controls.
• Mandatory pre‑bid site inspection on June 16 2026; RFBI submissions due June 30 2026; bid deadline August 11 2026.