The City of Rocky Mount is seeking proposals from qualified contractors to restore spaces that received water damage due to sewer backup. The project includes repairs at 188 E Thomas and 196 E Thomas, which involve the removal of damaged materials, application of anti-microbial agents, and replacement of impacted walls, ceilings, and flooring. The kitchen area at 188 E Thomas requires the removal of base cabinets, dishwasher, shoe molding, and trim, followed by the installation of new lower cabinets, a replacement dishwasher, shoe molding, and trim. The contractor must also repaint and refinish the area to match existing surfaces. At 196 E Thomas, a commercial office space, the contractor will remove damaged ceilings, walls, and floor coverings and apply anti-microbial treatment before replacing all impacted materials.
Key aspects of the project include:
• Removal of damaged materials and application of anti-microbial agents
• Replacement of impacted walls, ceilings, and flooring
• Installation of new cabinets, dishwasher, and trim in the kitchen area
• Repainting and refinishing to match existing surfaces
• Compliance with all laws, ordinances, codes, rules, and regulations
• Maintenance of a safe and healthy work environment
• Cooperation with the designer and owner to coordinate construction activities