The County of Howard is seeking a qualified construction firm to repair and upgrade the Country Meadows storm‑water management pond and dam. The work includes demolition of the existing spillway, construction of a new concrete weir wall, installation of low‑flow orifices, rip‑rap, geotextile, erosion‑control measures, dredging to restore storage, and associated utility coordination. The contractor must self‑perform at least 51 % of the work, provide required bonds, and comply with numerous environmental, safety, and labor regulations (rainforest protection, living‑wage, EBO, foreign‑service disclosure, etc.).
• New 90 ft × 15 ft × 3 ft concrete weir wall and upgraded spillway.
• Dredging, top‑soil replacement, and water‑quality treatment for a 0.60 acre permanent pool.
• Comprehensive erosion‑and‑sediment‑control plan (silt fences, rip‑rap, geotextile, sand‑bag barriers).
• Required subcontractor certifications (EBO, living‑wage, foreign‑service, rainforest act) and bonding (5 % bid bond, 100 % performance/pay bonds).