The Massachusetts Trial Court is seeking bids for the replacement of the UPS system at the Edward W. Brooke Courthouse in Boston, MA. The project includes the removal and disposal of the existing UPS system, furnishing and installation of a new UPS system, and completion of all required electrical connections and integration with existing systems. The estimated construction cost for this project is $490,000.00. The project is expected to be completed within 45 calendar days.
• The UPS system must be scalable to 500 kW, 480V, with a modular, expandable design, and double-conversion online with ≥96% efficiency.
• The battery system must be a high-capacity modular battery system, with lithium-ion preferred or approved equal, and integrated monitoring.
• The contractor must provide temporary power or phasing as needed to maintain critical loads and coordinate phased cutover with the owner and IT personnel.
• The contractor must evaluate the reuse of the existing transformer and provide alternate solutions if replacement is required.
• The contractor must provide manufacturer-authorized startup and full system verification prior to energizing, and provide a written test and commissioning report.