The Wave Street Curb Ramp Improvement Project involves the demolition and construction of concrete curb, gutter, sidewalk, curb ramps, storm drainage, signage and striping, hot mix asphalt pavement, pavement seal coat, and all necessary stormwater protection and traffic control requirements. The project requires a Class 'A' Contractor's license and compliance with prevailing wage rates and California Air Resources Board regulations. The contractor must also provide a bid bond, payment bond, and performance bond. The project includes various bid items, such as mobilization and demobilization, storm water compliance, traffic control, construction staking, and salvage of parking meters. The contractor must also provide detectable warning surfaces, reinforcement, and thermoplastic traffic lines and pavement markings.
• The project requires a non-mandatory pre-bid conference.
• The contractor must comply with the California Labor Code and the Monterey City Code.
• The project includes a bid schedule with various bid items.
• The contractor must provide a lump sum cost for mobilization and demobilization.
• The project requires the contractor to furnish all labor, materials, tools, equipment, and incidentals necessary for the work.
• The contractor must comply with the Standard Specifications, Plans, and Specifications.
• The project includes a basis of award, which is the lowest responsive responsible bid based on the total base bid.