Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›WAVE STREET CURB RAMP IMPROVEMENT PROJECT (35C1555)

City of Monterey·California

WAVE STREET CURB RAMP IMPROVEMENT PROJECT (35C1555)

Closes 11/18/2025$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Wave Street Curb Ramp Improvement Project involves the demolition and construction of concrete curb, gutter, sidewalk, curb ramps, storm drainage, signage and striping, hot mix asphalt pavement, pavement seal coat, and all necessary stormwater protection and traffic control requirements. The project requires a Class 'A' Contractor's license and compliance with prevailing wage rates and California Air Resources Board regulations. The contractor must also provide a bid bond, payment bond, and performance bond. The project includes various bid items, such as mobilization and demobilization, storm water compliance, traffic control, construction staking, and salvage of parking meters. The contractor must also provide detectable warning surfaces, reinforcement, and thermoplastic traffic lines and pavement markings. • The project requires a non-mandatory pre-bid conference. • The contractor must comply with the California Labor Code and the Monterey City Code. • The project includes a bid schedule with various bid items. • The contractor must provide a lump sum cost for mobilization and demobilization. • The project requires the contractor to furnish all labor, materials, tools, equipment, and incidentals necessary for the work. • The contractor must comply with the Standard Specifications, Plans, and Specifications. • The project includes a basis of award, which is the lowest responsive responsible bid based on the total base bid.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Cody Hennings

[email protected]

(831) 646-3473

Key dates

Opened
10/14/2025
Questions due
11/12/2025
Pre-bid meeting
10/28/2025
Closes
11/18/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
35C1555

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be between $500,000 and $2,000,000, based on the scope of work and the bid items listed in the document. The project involves various construction activities, such as demolition, excavation, and paving, which require significant labor, materials, and equipment costs. Additionally, the project requires compliance with prevailing wage rates and California Air Resources Board regulations, which may increase the costs. However, the actual budget may vary depending on the bids received and the contractor's ability to complete the project within the specified time limits and budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Virginia Department of Transportation·Virginia

Top match · 74%

B40_2027 ON CALL - ADA COMPLIANCE CURB RAMP IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

San Bernardino County·California

72% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

City of Danville·Virginia

72% match

IFB-26-27-024-Curb Market Parking Lot Improvements

Closes 11/3/2026Opened 10/8/2026

California Department of Transportation·California

71% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

City of Cerritos·California

71% match

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

Maryland Baltimore City Department of Transportation·Maryland

71% match

TR-27006 CURB REPAIR CITYWIDE

Closes 11/18/2026Opened 10/24/2026

California Department of Transportation·California

71% match

Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems.

Closes 12/16/2026Opened 10/26/2026

City of Helena·Montana

70% match

6th Ward ADA Ramps Project

Rolling / TBD closeOpened 3/11/2026

City of Richmond Government·Virginia

70% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Vernon·California

70% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

The City of Anaheim·California

70% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

Town of Westwood·Massachusetts

70% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

California Department of Transportation·California

70% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

LA Public Works Engineering Bureau·California

70% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

California Department of Transportation·California

70% match

ADA curb ramps, high tension cable barrier, and LED lighting.

Closes 11/5/2026Opened 9/21/2026

New York City Department of Design and Construction·New York

70% match

HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

City of Hermosa Beach·California

70% match

CIP 106 - Annual Street Improvements Project

Closes 12/9/2026Opened 10/29/2026

City of Danville·Virginia

69% match

IFB-26-27-024-Curb Market Parking Lot Improvements

Closes 11/3/2026Opened 10/8/2026

City of Fresno·California

69% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

City of Riverside·California

69% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Portland·Maine

69% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

Nevada Government·Nevada

69% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

California Department of Transportation·California

69% match

Replace AC Surf, RHMA overlay, drainage, curb ramps, & electrical.

Closes 11/10/2026Opened 9/21/2026

City of Culver City·California

69% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

County of Volusia·Florida

69% match

River Beach Drive Vehicular Beach Access Ramp Reconstruction Project

Closes 11/5/2026Opened 9/29/2026