Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›WASTEWATER RECLAMATION FACILITY REUSE FLOW METER VAULT…

City of Miramar·Florida

WASTEWATER RECLAMATION FACILITY REUSE FLOW METER VAULT INSTALLATION

Closes 1/13/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Miramar is soliciting bids from qualified vendors/contractors to provide and furnish all material, equipment, and labor needed to install a new 6 feet by 6 feet flow meter vault at the Wastewater Reclamation Facility. The project shall be turnkey, with the contractor responsible for all permitting, inspection, shop drawings, electrical certifications, and engineering documents. Key aspects of the project include: • Installation of a new flow meter vault • Provision of all necessary materials and equipment • Performance of all labor and construction work • Obtaining all necessary permits and inspections • Preparation of shop drawings and engineering documents • Compliance with all applicable laws and regulations The project requires a mandatory pre-bid conference and site visit, which will be held on December 10, 2025. Bids are due by January 13, 2026, at 7:00 p.m.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sally Phanor(Procurement Analyst)

[email protected]

(954) 602-3314

Key dates

Opened
12/4/2025
Pre-bid meeting
12/10/2025Mandatory
Site visit
12/10/2025Mandatory
Closes
1/13/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
IFB-26-003-0-2025/SP

Budget estimate

$200,000 – $500,000

Based on the scope of work, which includes the installation of a new flow meter vault, the estimated budget for this project could be in the range of $200,000 to $500,000. This estimate is rough and may vary depending on the complexity of the project, the materials and equipment required, and the labor costs. Factors that may influence the likely payment range include the size and complexity of the flow meter vault, the type of materials and equipment required, and the labor costs associated with the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 68%

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Arlington County Government·Virginia

68% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

The Metropolitan District·Connecticut

67% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

Georgia Pa​ulding County Water System·Georgia

67% match

27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault

Closes 11/13/2026Opened 10/9/2026

NYS Rockland County·New York

66% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

Connecticut Metropolitan District Commission·Connecticut

66% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Rural Community Water District of Georgetown County·South Carolina

65% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

U.S. Department Of The Interior·New Mexico

64% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

Atlantic County Utilities Authority, NJ·New Jersey

64% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Phoenix·Arizona

63% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

Immokalee Water & Sewer District·Florida

63% match

REQUEST FOR QUALIFICATIONS for PROFESSIONAL ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR WASTEWATER RECLAMATION FACILITY HARDENING PROJECT

Closes 11/25/2026Opened 10/29/2026

Washington Suburban Sanitary Commission, MD·Maryland

63% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

Metropolitan Council·Minnesota

63% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

City of Austin·Texas

62% match

Wastewater Billing Meter Assessments

Rolling / TBD closeOpened 7/13/2026

Florida Department of Corrections (FDC)·Florida

62% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026

Citrus County - Board of County Commissioners·Florida

62% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

City of Siloam Springs·Arkansas

61% match

REQUEST FOR QUALIFICATIONS (RFQ) WASTEWATER MASTER PLAN

Closes 11/20/2026Opened 10/18/2026

City of Bedford, TX·Texas

61% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

The Metropolitan Water District of Southern California·California

61% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026

City of Franklin·Tennessee

61% match

Wastewater Treatment Laboratory Services

Closes 11/4/2026Opened 10/8/2026

County of DeKalb, GA·Georgia

61% match

Concrete Meter Vault (Three (3) Year Multiyear Contract)

Closes 11/13/2026Opened 10/19/2026

City of Key West·Florida

61% match

Pump Station R Rehabilitation

Closes 11/16/2026Opened 10/15/2026

City of Rosenberg·Texas

61% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

U.S. Department Of Agriculture·Oregon

61% match

BPA Setup - Waste Removal and disposal from Vault toilets & Septic tanks at various sites for the Region 6 National Forest

Closes 3/31/2031Opened 4/28/2026

U.S. Bureau of Reclamation·United States of America

61% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026