The City of Chandler is seeking a qualified contractor to construct and finish a combined 1.15‑mile shared‑use pathway along the Kyrene Branch and Highline Canal corridors, linking to existing concrete paths in Tempe. The work includes concrete paving, curb‑and‑gutter installation, ADA‑compliant curb ramps, lighting, signalized crossings, way‑finding signage, landscaping, irrigation, utility coordination, and related site‑work such as grading, drainage, and utility installations. The contract is federally funded, self‑performance of at least 50 % of the total value is required, and the contractor must meet extensive bonding, insurance, and “Buy‑America” compliance standards.
• Construct concrete shared‑use paths, sidewalks, curb‑and‑gutter, and detectable warning surfaces.
• Install lighting, signalized crossings, way‑finding signage, and associated electrical work.
• Perform utility coordination (water, gas, telecom) and install irrigation piping, water meters, and related fittings.
• Provide grading, drainage, retaining walls, erosion control, landscaping, and site‑restoration in compliance with ADA and flood‑plain requirements.
• Deliver all required certifications (Bid Bond, Performance/Payment Bonds, Insurance, Federal Non‑Collusion, EEO, Buy‑America, DBE) and adhere to a 450‑day construction schedule.