Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›WM4830-03 Canal WTP Filter Rehabilitation and Valve…

City of Columbia·South Carolina

WM4830-03 Canal WTP Filter Rehabilitation and Valve Replacements

Closes 10/23/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Columbia is seeking a qualified contractor to perform comprehensive filter rehabilitation and valve replacement work at the Canal Water Treatment Plant (WTP). The scope includes demolition, trenching, concrete work, metal fabrication, valve and actuator installation, pipeline testing, commissioning, and close‑out documentation for multiple filter units and associated piping. The contract requires the contractor to provide all labor, equipment, materials, traffic control, and 24‑hour emergency response capability, and to meet a 600‑day substantial completion schedule with a total project duration of approximately 630 days. The project is governed by South Carolina licensing requirements, includes liquidated damages of $1,000 per day for delays, and mandates extensive record‑keeping, warranties, and a one‑year post‑completion warranty. • Location: Canal WTP, Columbia, SC • Contract type: Invitation for Bid (IFB) – construction/rehabilitation • Estimated contract length: 630 calendar days (≈ 1.7 years) • Key tasks: filter underdrain replacement, filter media replacement, valve and actuator installation (butterfly, gate, resilient‑seated), pipe support, testing, commissioning, and final close‑out • Required licenses: South Carolina WP contractor license and any specialty trade licenses • Performance bonds, insurance, and warranties required • Submission deadline: 23 Oct 2026; pre‑bid Zoom meeting 24 Sep 2026 • No DBE requirements; standard liquidated damages apply.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jeffrey Hubbard(Procurement Specialist II)

[email protected]

Key dates

Opened
9/11/2026
Questions due
10/15/2026
Pre-bid meeting
9/24/2026
Closes
10/23/2026
Duration
630 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
BID007-26-27-JAH Addendum 3

Budget estimate

$2,000,000 – $5,000,000

The solicitation does not disclose a contract value, but based on the extensive civil, mechanical, and electrical scope (multiple filter units, valve actuators, pipe replacement, testing, and a 630‑day schedule), comparable municipal water‑treatment upgrades typically range from $2 million to $5 million. Factors influencing the final amount include the number of filter trains, valve sizes, site conditions, and any additional spare‑parts or warranty services required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richland·Washington

Top match · 74%

Water Treatment Plant Filter Bay Valve Replacement

Closes 11/3/2026Opened 9/27/2026

U.S. Department Of Defense·United States of America

70% match

48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF

Closes 11/20/2026Opened 10/22/2026

Georgia City of Carrollton·Georgia

70% match

WTP SCADA and Filter Control System Improvements

Closes 12/3/2026Opened 10/29/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

69% match

WTP Pipe Gallery Replacement - St. Charles County, MO

Closes 11/18/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

69% match

48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF

Closes 11/17/2026Opened 8/19/2026

City of Hollywood·Florida

69% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

69% match

29--VALVE,RELIEF,FUEL, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

69% match

48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF

Closes 12/15/2026Opened 9/16/2026

City of Beaumont·California

68% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Western Virginia Water Authority·Virginia

68% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

New York City Department of Environmental Protection·New York

68% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

U.S. Department Of Defense·Washington

68% match

NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1

Closes 11/30/2026Opened 10/27/2026

Santa Clara Valley Water District·California

68% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

City of Appleton·Wisconsin

68% match

WTP BOILER REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

North Carolina City of Raleigh·North Carolina

68% match

EM Johnson WTP 605 High Service Pump Replacement

Closes 12/8/2026Opened 10/30/2026

City of Charlotte·North Carolina

68% match

McDowell WWTP Headworks Improvements

Rolling / TBD closeOpened 6/1/2026

North Carolina Orange Water and Sewer Authority·North Carolina

68% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

Washington Suburban Sanitary Commission, MD·Maryland

68% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

68% match

48--VALVE,SOLENOID, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

68% match

48--VALVE,LINEAR,DIRECT, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

67% match

VALVE,SOLENOID

Closes 11/30/2026Opened 10/22/2026

Terrebonne Parish Consolidated Waterworks District No. 1·Louisiana

67% match

Boudreaux Canal Crossing Waterline Replacement TPCW Project No. H.002244

Closes 11/10/2026Opened 10/13/2026

U.S. Department Of Defense·Pennsylvania

67% match

Repair 1 Unit NSN 4810013539209

Closes 11/21/2026Opened 10/22/2026

Norton Housing Authority·Massachusetts

67% match

Tub Surround & Shower Valve Replacement REBID

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

67% match

48--VALVE ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/19/2026