Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Exchange of a Heating System

U.S. Department Of State·District of Columbia

Exchange of a Heating System

Closes 7/15/2026$10k – $50kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves replacing an existing boiler with a modern Vaillant gas condensing unit featuring integrated domestic hot water heating. The scope of work includes dismantling and disposing of the old equipment, inspecting the existing chimney system, and installing the new system in accordance with applicable German technical codes and standards. Additional requirements include installing safety and control components, providing documentation, and conducting a mandatory site visit prior to submission of a quotation. • The new system must be installed in accordance with applicable German technical codes and standards. • The existing chimney system must be inspected to ensure compliance with current regulations. • A mandatory site visit is required prior to submission of a quotation. • The scope of work includes the professional dismantling and disposal of the old equipment and associated systems.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Berlin Procurement

[email protected]

Key dates

Opened
7/2/2026
Closes
7/15/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
23822
Solicitation №
PR16086352

Budget estimate

$10,000 – $50,000

The budget for this project can be estimated based on the scope of work, which includes replacing a boiler and installing a new heating system. The cost of a Vaillant gas condensing unit can range from $5,000 to $20,000, depending on the model and features. Additionally, labor costs, disposal of the old equipment, and inspection of the chimney system will add to the overall cost. Considering these factors, the budget for this project could be in the range of $10,000 to $50,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Homeland Security·Maryland

Top match · 70%

HEAT EXCHANGER

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·California

68% match

41--HEAT EXCHANGER

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

68% match

HEAT INTERCHANGER,R

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

67% match

16--HEAT EXCHANGER,AIR

Closes 12/3/2026Opened 10/20/2026

U.S. Department Of Defense·Oklahoma

67% match

Heat Exchanger

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Defense·Georgia

67% match

41--HEAT INTERCHANGER,REFR

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

66% match

16--HEAT EXCHANGER,AIR

Closes 12/2/2026Opened 9/3/2026

U.S. Department Of Defense·United States of America

66% match

HEAT EXCHANGER,AIR

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

66% match

16--HEAT EXCHANGER,AIR

Closes 11/2/2026Opened 10/5/2026

U.S. Department Of Defense·Oklahoma

66% match

Purchase (Spares) B-2 Heat Exchanger

Closes 11/10/2026Opened 10/13/2026

U.S. Department Of Defense·Pennsylvania

65% match

16--HEAT EXCHANGER,AIR

Closes 12/2/2026Opened 8/18/2026

U.S. Department Of Veterans Affairs·Colorado

65% match

J045--Correction and Rebuild of Shell and Tube Heat Exchangers: One time Service

Closes 11/10/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

65% match

28--INSERT,HEAT EXCHANG

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

65% match

16--HEAT EXCHANGER,AIR

Closes 12/1/2026Opened 8/18/2026

Ysleta ISD·Texas

65% match

Air Conditioning, Heating, and Ventilating Equipment, Parts, Service and Accessories

Closes 11/30/2029Opened 9/18/2025

National Aeronautics And Space Administration·Alabama

64% match

TECHNOLOGY TRANSFER OPPORTUNITY: Solid-State System Efficiently Generates Purified O2 (MSC-TOPS-148)

Closes 8/10/2027Opened 8/10/2026

U.S. Department Of Defense·United States of America

64% match

16--HEAT EXCHANGER,AIR

Closes 11/1/2026Opened 9/17/2026

Ysleta ISD·Texas

64% match

Air Conditioning, Heating, and Ventilating Equipment, Parts and Accessories

Closes 11/30/2029Opened 9/18/2025

City of Branson·Missouri

64% match

RFP 2890-02 Fire Station 2 Radiant Heating System

Closes 11/4/2026Opened 10/5/2026

Buy Board Purchasing Cooperative·Texas

64% match

Trade Services (HVAC)

Closes 11/12/2026Opened 9/25/2026

KCDA·Washington

64% match

HVAC Building System Installs (NEW)

Closes 12/3/2026Opened 10/28/2026

U.S. Department Of Defense·North Carolina

63% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

63% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

63% match

45--HEATING ELEMENT,ELECTR

Closes 11/8/2026Opened 10/28/2026

Maryland Department of Human Services·Maryland

63% match

Data Center Heating and Cooling

Closes 12/1/2026Opened 10/28/2026