Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Dredging of Los Angeles River Estuary and Port of Long…

U.S. Department Of Defense·California

Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA)

Closes 4/24/2026$5M – $10MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Army Corps of Engineers is seeking sources for a dredging project at the Port of Long Beach and the Los Angeles River Estuary. The project involves dredging and disposing of material from the federal navigation channels, with an estimated construction magnitude of $5-10 million and a performance period of 180 calendar days. The contractor must have experience with dredging to depths of -76 feet MLLW and ocean or nearshore placement. The contractor must also have proven experience working in the open ocean environment and have the necessary equipment, including dredge equipment and scows. • The project requires a 100% Total Small Business Set Aside. • The contractor must be registered in the System for Award Management (SAM) to be eligible for award of Government contracts. • The contractor must have a small business size standard of $45,000,000.00 under NAICS code 237990. • The contractor must have experience with construction bonding and have the necessary bonding capacity. • The contractor must have experience with environmental and construction permits, including California permits.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael G. Robinson

[email protected]

(213) 452-3311

Key dates

Opened
4/3/2026
Closes
4/24/2026
Duration
180 days

Last updated

Details

Type
Sole Source
Industry
Construction
NAICS
237990
Solicitation №
W912PL26S0012

Budget estimate

$5,000,000 – $10,000,000

The estimated construction magnitude is between $5,000,000 and $10,000,000. This range is based on the project description and the required services, including dredging and disposing of material from the federal navigation channels. The actual budget may vary depending on the contractor's experience, equipment, and bonding capacity.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 74%

Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LA

Closes 6/12/2028Opened 5/28/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)

Closes 7/16/2027Opened 7/16/2025

U.S. Department Of Defense·Louisiana

71% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 8/10/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

71% match

Port Fourchon Navigation Channel, Maintenance Dredging FY26, Lafourche Parish, LA

Closes 4/7/2028Opened 3/23/2026

U.S. Department Of Defense·Louisiana

71% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

70% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 9/11/2026

California Grants·California

70% match

Proposition 68 Grants for Lower Los Angeles River (LLAR)

Rolling / TBD closeOpened 1/27/2025

U.S. Department Of Defense·Louisiana

70% match

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

U.S. Department Of Defense·Louisiana

70% match

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

Closes 3/31/2027Opened 10/5/2026

U.S. Department Of Defense·Pennsylvania

70% match

RESERVE BASIN MAINTENANCE DREDGING CONTRACT FOR SITES AT THE PHILDELPHIA NAVY YARD IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILIY

Closes 1/15/2027Opened 10/9/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

Toledo - Lucas County Port Authority·Ohio

70% match

Remedial Action for Lower Maumee River Sway Bridge within the Maumee Area of Concern

Closes 12/8/2026Opened 10/29/2026

LA County Internal Services Department·California

70% match

OCEAN WATER TESTING - AS-NEEDED

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Florida

70% match

PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA

Closes 11/20/2026Opened 10/5/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

70% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

Port of Long Beach·California

69% match

HD-S3180 Pier B On-Dock Rail Support Facility North Yard Utilities & Pier B St. Widening

Closes 11/17/2026Opened 9/17/2026