Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alabama
  4. ›Environmental Services
  5. ›327-SFK-Reclamation Mays Mining P-3897

Alabama Surface Mining Commission·Alabama

327-SFK-Reclamation Mays Mining P-3897

Closes 5/27/2026$100k – $150kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Alabama Surface Mining Commission is seeking a qualified contractor to perform reclamation work at the Crescent Valley Mine (Sections 25 & 26, Walker County, AL). The effort includes grading to original contours, construction/repair of diversion berms, reburying a coal stockpile with lime and cover, replacing two 36‑inch HDPE spill‑pipe sections, installing riprap‑based downdrain structures, and seeding/revegetating the disturbed areas. All work must be completed within the stipulated time frames, comply with state and federal environmental regulations, and be documented with receipts, permits, and inspection reports. • Grading and berm construction to be finished within 90 calendar days after receipt of PO and NPDES permit. • Coal stockpile rebury (4 ft cover) with lime placed between 1‑ft lifts. • Installation of 2 × 36″ × 60′ HDPE double‑wall pipes in Basin 013. • Placement of 2,254 tons of Class II riprap for downdrain and check‑dam structures. • Seeding/revegetation of ~5 acres using specified seed mixes, lime, and fertilizer, completed within 30 calendar days after grading approval. Compliance with ADEM storm‑water permitting, on‑site Commission representation during seed/fertilizer application, and detailed documentation are mandatory. The contract will be awarded to the lowest responsible bidder not exceeding a ceiling of $142,830.

Attached files

Contact

Brandon Hamilton(Conference contact)

(205) 919-4350

Key dates

Opened
5/5/2026
Questions due
5/20/2026
Pre-bid meeting
5/13/2026Mandatory
Site visit
5/13/2026Mandatory
Closes
5/27/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Environmental Services
NAICS
562910
Solicitation №
SRC0000033838

Budget estimate

$100,000 – $150,000

The solicitation caps the total contract value at $142,830. Assuming typical profit margins for reclamation work (10‑20 %), the contractor could expect earnings between roughly $100k and $150k after accounting for material costs, labor, and overhead. Factors influencing the final budget include the actual amount of riprap required, fuel and equipment usage, and any cost‑allowances for unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Pennsylvania Department of Environmental Protection·Pennsylvania

Top match · 66%

Abandoned Mine Reclamation Project – South Nanty Glo 2

Closes 11/12/2026Opened 10/16/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

65% match

Abandoned Mine Reclamation Project – North Liberty South (Slippery Rock Township, Butler County & Liberty Township, Mercer County)

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of The Interior·Washington

65% match

C--GEOTECHNICAL ARCHITECTURE AND ENGINEER SERVICES IN

Closes 11/21/2026Opened 10/21/2026

Alaska Department of Natural Resources – Division of Mining, Land and Water·Alaska

65% match

APMA F20269847 - A Placer Mining and Suction Dredging Application Within the Nome Mining District - Salmon Creek

Rolling / TBD closeOpened 9/23/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

65% match

Abandoned Mine Reclamation – Beulah Road (Lucia Drive)

Closes 11/12/2026Opened 10/16/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

64% match

Abandoned Mine Reclamation Project – Rocky Glen Pond, Moosic Borough, Lackawanna County

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of Defense·Pennsylvania

64% match

N0038326PR0R851_FMS

Closes 11/19/2026Opened 10/19/2026

Alaska Department of Natural Resources·Alaska

64% match

APMA F20229770 - Amendment 1 - A Placer Application Within the Fairbanks Mining District - Treasure Creek

Rolling / TBD closeOpened 9/2/2026

Spartanburg County Government·South Carolina

64% match

RFP# 2027028 SPARTANBURG COUNTY TIER 3 ROADWAY RECLAMATION‑GROUP C

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Pennsylvania

64% match

N0038326PR0R914_FMS Repair

Closes 11/21/2026Opened 10/7/2026

U.S. Department Of Defense·Pennsylvania

64% match

N0038326PR0R880_FMS

Closes 11/16/2026Opened 10/15/2026

City of Willcox·Arizona

63% match

RFP 26-01 Rock Crushing

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Defense·Arizona

63% match

N0038327QD104 - REPAIR 3 UNITS STARTER ENGINE GAS

Closes 11/3/2026Opened 10/2/2026

Alaska Department of Natural Resources – Division of Mining, Land and Water·Alaska

63% match

APMA F20239783 AMD1 - A Placer Mining Permit Amendment Application within the Fairbanks Mining District, Fairbanks Creek

Rolling / TBD closeOpened 10/7/2026

Idaho Department of Lands·Idaho

63% match

Mine Reclamation Plan Technical Review Services

Closes 11/18/2026Opened 10/7/2026

Henrico County·Virginia

63% match

Paver Laid Full Depth Reclamation

Closes 11/4/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

63% match

10--FLOAT,MINE SWEEPING

Closes 11/2/2026Opened 10/21/2026

Division of Abandoned Mine Lands, Commonwealth of Kentucky·Kentucky

63% match

RFB-107-27 25033AMLBAML, LETCHER COUNTY

Closes 11/17/2026Opened 10/26/2026

U.S. Department Of Defense·Rhode Island

63% match

FMS Repair of NIIN 013070911

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·Pennsylvania

63% match

N0038326PR0R795_FMS REPAIR

Closes 11/21/2026Opened 10/22/2026

U.S. Department Of Defense·Pennsylvania

62% match

FMS

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Defense·Pennsylvania

62% match

53--MOUNT,RESILIENT,WEA, IN REPAIR/MODIFICATION OF

Closes 11/9/2026Opened 5/9/2026

U.S. Department Of Defense·United States of America

62% match

FD2030-26-01492

Closes 3/24/2027Opened 3/24/2026

U.S. Department Of Defense·United States of America

62% match

39--BLOCK,TACKLE

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Nebraska

62% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026