The budget for this project can be estimated based on the scope of work and the materials required. The construction of ±192 LF of 18” RCP storm drain pipe, ± 0.49 miles of base and paving, including ± 6,213 SY of 8” soil cement base, ± 5,925 SY of surface treatment with an alternative of ± 665 tons of 9.5mm Superpave, is a significant project that requires a substantial amount of materials and labor. The cost of materials, including the storm drain pipe, soil cement base, and Superpave, can be estimated to be around $500,000 to $1,000,000. Labor costs, including the cost of equipment and personnel, can be estimated to be around $500,000 to $1,500,000. Therefore, the total budget for this project can be estimated to be around $1,000,000 to $2,500,000.