Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Environmental Services
  5. ›Professional & Technical Services for the Design of an…

Connecticut Town of Mansfield·Connecticut

Professional & Technical Services for the Design of an Aerated Static Compost

Closes 4/30/2026$100k – $500kRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of CT - DAS Procurement is seeking professional and technical services for the design of an aerated static compost system at the Mansfield Transfer Station. The project involves the design of a composting system, and the selected vendor will be responsible for providing the necessary expertise and services to complete the project. • The project is located at the Mansfield Transfer Station. • The composting system will be designed to handle organic waste. • The selected vendor will be responsible for providing all necessary equipment and materials. • The project requires professional and technical services, including design and engineering expertise. • The State of CT - DAS Procurement is seeking a qualified vendor to provide these services.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sheri Baczanski

[email protected]

(860) 429-3331

Key dates

Opened
4/1/2026
Closes
4/30/2026

Last updated

Details

Type
Request for Qualification
Industry
Environmental Services
NAICS
541330
Solicitation №
35909

Budget estimate

$100,000 – $500,000

The budget for this opportunity is difficult to estimate, as the document does not provide a specific budget or estimated total. However, based on the scope of the project, which involves the design of an aerated static compost system, the budget could be substantial. The estimated budget could range from $100,000 to $500,000, depending on the complexity of the design, the size of the composting system, and the level of expertise required. Factors that may influence the likely payment range include the experience and qualifications of the selected vendor, the level of competition for the project, and the specific requirements of the State of CT - DAS Procurement.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Inland Empire Utilities Agency·California

Top match · 73%

Finished Compost Transportation Services

Closes 11/19/2026Opened 10/12/2026

City of Baltimore·Maryland

70% match

Yard Waste Composting Services

Closes 11/3/2026Opened 9/4/2026

City of San Diego·California

69% match

Biosolids Transportation and Management Services

Closes 11/3/2026Opened 10/9/2026

County of Volusia·Florida

69% match

Professional Solid Waste Management Engineering Services

Closes 12/1/2026Opened 10/27/2026

Maryland City of Baltimore·Maryland

69% match

Yard Waste Composting Services

Closes 11/4/2026Opened 9/17/2026

California Department of Water Resources·California

68% match

Plant Janitorial Services

Closes 11/10/2026Opened 10/12/2026

Maryland City of Baltimore·Maryland

68% match

Hydroseeding Service

Closes 12/16/2026Opened 10/17/2026

Massachusetts Town of Duxbury·Massachusetts

68% match

Design Services Alarms and Backup Power Solutions for 3Sewer Lift Stations

Rolling / TBD closeOpened 7/3/2024

City of Fresno·California

68% match

Mailbox Only - RFQ for Owner's Advisor Services for the 1,2,3-Trichloropropane (TCP) Water Treatment Project

Closes 11/3/2026Opened 9/22/2026

Ohio Air Quality Development Authority·Ohio

68% match

Request for Qualifications for Technical Support Services

Closes 6/29/2027Opened 10/6/2026

Sun 'n Lake Improvement District·Florida

68% match

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

Massachusetts City of Pittsfield·Massachusetts

67% match

Designer Services

Closes 11/4/2026Opened 10/14/2026

Charles County Government·Maryland

67% match

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

Closes 11/9/2026Opened 7/8/2026

City of Alhambra·California

67% match

PROFFESIONAL ENGINEERIGN DESIGN SERVICES (PS&E) FOR FY26/27 RMRA STREETS REHABILITATION PROJ

Closes 11/19/2026Opened 9/21/2026

Town of Manchester·Connecticut

67% match

ENGINEERING SERVICES - DRY BROOK CULVERT REPLACEMENT

Closes 11/10/2026Opened 10/13/2026

City of Nixa·Missouri

67% match

Professional Civil Engineering Services

Closes 11/17/2026Opened 10/14/2026

City of Parkersburg·West Virginia

67% match

INQUIRY 2761 - TEMPORARY ENGINEERING SERVICES

Closes 11/12/2026Opened 10/28/2026

City of Ontario·California

67% match

Engineering Design Services for the Turner Avenue Storm Drain and Street Improvement Project (SM2701)

Closes 11/12/2026Opened 10/15/2026

Western Municipal Water District·California

67% match

RFP: Engineering Design Services for Abington Sewer Replacement Project

Closes 11/19/2026Opened 10/15/2026

U.S. Department Of Agriculture·Kentucky

67% match

Lagoon Aeration

Closes 11/19/2028Opened 11/6/2024

City of Fulshear·Texas

67% match

Wastewater Services

Closes 11/3/2026Opened 10/16/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

67% match

CIP 2537 Design Services for Installation of Alljoy Phase 2 Low-Pressure Sewer System

Closes 8/4/2027Opened 7/6/2026

City of Dermott·Arkansas

67% match

Notice of Request for Qualifications for Engineering Services

Closes 11/2/2026Opened 10/18/2026

City of Winston Salem·North Carolina

67% match

Sanitary Sewer Chemical Root Control Services

Closes 11/2/2026Opened 10/12/2026

Fort Pierce Utilities Authority·Florida

67% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026