Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›Flagler Drive Area Underground Utilities Hardening

City of West Palm Beach·Florida

Flagler Drive Area Underground Utilities Hardening

Closes 4/21/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of West Palm Beach is accepting bids from qualified contractors to furnish and assume full responsibility for the complete and proper rehabilitation of existing sanitary sewer infrastructure via cured-in-place-pipe lining and various point repairs of existing sanitary sewer mains, manholes, and laterals as shown in the construction drawings and described in the technical specifications for the project. The project is funded by a State of Florida, Department of Environmental Protection, Grant Agreement. The successful contractor must comply with grant requirements. Key aspects of the project include: • Rehabilitation of existing sanitary sewer infrastructure • Cured-in-place-pipe lining • Point repairs of existing sanitary sewer mains, manholes, and laterals • Compliance with grant requirements • Construction drawings and technical specifications provided

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sharon Sepulveda(Senior Procurement Specialist)

[email protected]

(561) 822-1056

Key dates

Opened
3/20/2026
Closes
4/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
ITB-25.26.109 SS-0-2026/SS

Budget estimate

$500,000 – $2,000,000

The project's estimated budget is not provided, but based on the scope of work, which includes the rehabilitation of existing sanitary sewer infrastructure, cured-in-place-pipe lining, and point repairs, the estimated cost could be in the range of $500,000 to $2 million. This estimate is influenced by the complexity of the project, the materials required, and the labor costs. However, without more specific information, this is a rough estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Department of Forestry and Fire Protection·California

Top match · 67%

IFB 9CA07882 - Underground Electrical Power Infrastructure Installation

Closes 11/18/2026Opened 9/16/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

67% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

CHA Consulting, Inc.·Indiana

66% match

EVANSVILLE-VANDERBURGH AIRPORT AUTHORITY DISTRICT REGIONAL AIRPORT – FLIGHTLINE DRIVE UTILITY EXTENSION

Closes 12/2/2026Opened 10/29/2026

City of Fargo·North Dakota

66% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of West Palm Beach·Florida

66% match

Flagler Drive Lift Station Retrofits (Lift Station No. 3 and Lift Station No. 40)

Closes 11/30/2026Opened 10/22/2026

U.S. Department Of State·United States of America

66% match

Trenching, Conduit and Ground-well Installation

Closes 11/25/2026Opened 10/28/2026

City of Charlotte·North Carolina

65% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Lee County Electrical Cooperative·Florida

65% match

North Lehigh Substation Underground Construction

Closes 11/6/2026Opened 9/4/2026

City of Cedar Rapids·Iowa

65% match

2nd Street SE Relocation of Interior Vault Utilities

Closes 11/18/2026Opened 10/21/2026

City of Charlotte·North Carolina

65% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

65% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Frostproof·Florida

65% match

Septic to Sewer - W 9th St

Closes 12/8/2026Opened 10/26/2026

City of Orangeburg·South Carolina

65% match

Utility Transmission & Distribution System Construction & Maintenance

Closes 12/2/2026Opened 10/27/2026

City of Riverside·California

65% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

City of Charlotte·North Carolina

65% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Vernon·California

65% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Key West·Florida

65% match

CDBG-MIT – Trenchless Installation of Utilities Across Fleming Channel

Closes 12/2/2026Opened 10/15/2026

City of Charlotte·North Carolina

64% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Charlotte·North Carolina

64% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Fort Wayne·Indiana

64% match

Electrical Distribution Equipment

Closes 11/10/2026Opened 10/15/2026

Gwinnett County Government·Georgia

64% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

City of Frostproof·Florida

64% match

Septic to Sewer - Wood and Palmetto Ave

Closes 12/8/2026Opened 10/26/2026

Gwinnett County Government·Georgia

64% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

City of Charlotte·North Carolina

64% match

Shamrock Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/15/2027

U.S. Department Of Defense·Utah

64% match

Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance

Closes 11/18/2026Opened 10/14/2026