Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›Parsley Boulevard Greenway Connectors

City of Cheyenne·Wyoming

Parsley Boulevard Greenway Connectors

Closes 1/13/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cheyenne is seeking bids for the Parsley Boulevard Greenway Connectors project. The project includes the installation of 640 linear feet of new 10-foot wide concrete sidewalk, removal of curb, gutter, and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach, and installation of crushed base at alley. The project also includes the relocation of signage and Greenway fence. The successful bidder will be required to execute a contract and provide performance and payment bonds. • The project is located within the public right of way in accordance with City of Cheyenne Construction Standards. • The contractor shall not do any work or store any material within the Interior Heights Addition Blocks 32 & 33 as described on the plans. • A pre-bid meeting will be held on December 22, 2025, at 2:00 pm. • Bids must be submitted electronically through the City's eProcurement Portal. • The City reserves the right to reject any or all bids or to waive any formalities in the bidding.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

TJ Barttelbort(Purchasing Manager)

[email protected]

(307) 773-1045

Key dates

Opened
12/11/2025
Questions due
12/29/2025
Pre-bid meeting
12/22/2025
Closes
1/13/2026
Projected award
2/9/2026
Duration
105 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
S-11-26

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and the materials required. The project includes the installation of 640 linear feet of new 10-foot wide concrete sidewalk, which can cost around $100 to $150 per linear foot, depending on the location and the contractor. Additionally, the project includes the removal of curb, gutter, and sidewalk, installation of curb and gutter with asphalt patch, replacement of asphalt drive approach, and installation of crushed base at alley. The total cost of the project can be estimated to be around $200,000 to $500,000. The factors that may influence the likely payment range include the location of the project, the experience and reputation of the contractor, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Harrisonburg·Virginia

Top match · 68%

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Charlotte·North Carolina

66% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

Greene County·Virginia

65% match

#SMART18 - Route 670 Connector A Design-Build Project

Closes 2/9/2027Opened 10/30/2026

City of Austin·Texas

65% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

City of Charlotte·North Carolina

65% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Charlotte·North Carolina

65% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

City of Charlotte·North Carolina

65% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

City of Cleveland·Ohio

64% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

NYS East Fishkill, Town of·New York

64% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Kearney·Missouri

64% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

City of Philadelphia·Pennsylvania

63% match

PW Bid 3993ECMS - MPMS 82199 Cottman Ave Redesign with GSI

Closes 12/3/2026Opened 10/16/2026

City of Smithville·Missouri

63% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

Northwest Arkansas Razorback Regional Greenway Alliance·Arkansas

63% match

REQUEST FOR BIDS – RAZORBACK GREENWAY WAYFINDING SIGNS PROJECT

Closes 11/3/2026Opened 10/11/2026

City of Green Bay·Wisconsin

63% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

City of Bakersfield·California

63% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

City of Richmond Government·Virginia

63% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Massachusetts Department of Transportation·Massachusetts

63% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

City of Charlotte·North Carolina

63% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

City of Pasadena·California

63% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

City of Charlotte·North Carolina

63% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

63% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

City of Brandon·Mississippi

63% match

GRANTS FERRY PARKWAY MULTI-USE PATH PHASE 2

Closes 11/13/2026Opened 10/13/2026

City of Charleston, WV·Virginia

63% match

Capital Connector Construction Project

Closes 12/3/2026Opened 10/5/2026

Great Rivers Greenway·Missouri

63% match

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

City of Plano·Texas

63% match

RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033

Closes 12/9/2026Opened 10/26/2026