The project consists of a mechanical dredge of up to 1886 CY of material from the Day Pond and dewatering this material. The dredge area is approximately .34 acres and the bottom elevation is 110 ft NVD. The contractor will segregate and dispose of up to 3018 tons of dewatered dredged material. The work also includes removing and replacing one 24' culvert at the end of the pond.
• The project requires a mechanical dredge of the Day Pond
• The contractor must dewater the dredged material and dispose of it
• The project includes removing and replacing a 24' culvert
• The project is located in Hatfield, Massachusetts
• The bid opening date is November 19, 2025
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.