Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Country Club of Miami Pedestrian Bridge Replacement

Miami-Dade County·Florida

Country Club of Miami Pedestrian Bridge Replacement

Closes 3/13/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Scope of Work: (Contractor must obtain and submit all permits prior to performing any work.) SCOPE OF WORK: (Contractor must obtain and submit all permits prior to performing any work.) CONTRACTOR shall review all documents, specifications, plans, and scope of work provided by Miami-Dade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the WORK described in the contract documents including but not limited to: 1. General Provide all labor, materials, equipment, engineering, and supervision necessary to demolish the existing pedestrian bridge and construct a new pressure-treated (PT) wood pedestrian bridge, complete and operational, in accordance with applicable codes, standards, and approved engineering documents. 1.1) CONTRACTOR shall review all documents, specifications, plans and scope of work provided by Miami-Dade County Park & Recreation Construction Division for work to be completed. Furnish all labor, equipment and materials required. 1.2) Contractor shall be responsible for attaining all pertinent permits from any and all governing entities (i.e., City of Miami, Miami-Dade RER, Electrical, Plumbing, Miami-Dade Public Works, Miami-Dade Water & Sewer, DERM, Fire, FDEP, Florida Department of Health, South Florida Water Management, US Army Corps of Engineers, Florida Department of Environmental Protection, USCG etc.) needed to begin and complete all phases of work. 1.3) If applicable, prior to starting project, CONTRACTOR shall notify any departments having jurisdiction of the work being performed. 1.4) CONTRACTOR shall comply with Office of Resilience initiatives, to include Sea Level Rise. 1.5) Contractor shall coordinate all required inspections/tests and documentation required by any/all governing entities, i.e., City of Miami, Miami-Dade Building Department, etc. 1.6) It shall be the contractor’s responsibility to ensure that all required regulatory or proprietary permits are obtained prior to commencement of work. 2. Demolition Demolish the existing pedestrian bridge structure in its entirety. Remove and legally dispose of all demolished materials off-site. Protect adjacent landscaping, utilities, and improvements during demolition operations. 3. Foundations Furnish and install six (9) PT Ø12” piles, CAC 2.5 treatment. Minimum pile embedment: 10 feet Pile installation to be plumb, aligned, and in accordance with engineered drawings and geotechnical requirements. 4. Superstructure Install PT girders, size 3” × 12”, CAC .6. Install PT joists, size 3” × 10”, CAC .6, spaced at 16 inches on center Install PT decking, size 2” × 8”, CAC .6, securely fastened per manufacturer and engineering requirements. 5. Railings and Safety Features Provide and install 42-inch-high guardrails fabricated from stainless steel Type 316. Install PT 4” × 6” guardrail posts spaced at 4 feet on center. All railings to meet applicable building code and safety requirements for pedestrian bridges. 6. Environmental Protection Install FDOT Type II turbidity barrier, approximately 250 to 350 linear feet, as required to control sediment and protect adjacent waterways. Maintain turbidity controls for the duration of construction and remove upon completion in accordance with regulatory requirements. 7. Site Access and Ground Protection Provide ground protection for construction access using ten (10) sheets of PT ¾” plywood, size 4’ × 8’. Protection to cover approximately 40 linear feet of access route. Remove ground protection upon completion and restore affected areas. 8. Engineering and Permitting Support 9. Contractor shall be responsible for all damage to the Parks/Marina and private property due to the construction and shall make all necessary repairs at the contractors’ expense. Contractor shall complete all work within 90 days of “Notice to Proceed” date.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
2/20/2026
Closes
3/13/2026

Last updated

Details

Industry
Construction
NAICS
237310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Alexandria·Louisiana

Top match · 66%

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

Georgia City of Chattahoochee Hills·Georgia

65% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

65% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Connecticut Town Of Clinton·Connecticut

65% match

Replacement of Bridge No. 06956, Country Village Lane over Unnamed Brook

Closes 11/4/2026Opened 10/9/2026

Town of Pulaski·Virginia

64% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

64% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

City of Charlotte·North Carolina

63% match

Morris Field Bridge Replacement

Rolling / TBD closeOpened 5/1/2026

BREC·Louisiana

63% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Ormond Beach - Purchasing Office·Florida

63% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Delaware River Joint Toll Bridge Commission·New Jersey

63% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Town of Clinton·Connecticut

63% match

Replacement of Bridge No. 06956, Country Village Lane

Closes 11/4/2026Opened 10/7/2026

City of Atlanta·Georgia

63% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Division of Highways·North Carolina

62% match

Replacement of Bridge 560098 (Purchase Order DM00407)

Closes 11/18/2026Opened 10/28/2026

Maryland Worcester County Government·Maryland

62% match

Hotel Road Bridge Replacement

Closes 12/15/2026Opened 10/30/2026

City of Frontenac·Missouri

62% match

STP-5503(609) - Spoede Road Bridge Replacement

Closes 11/2/2026Opened 9/15/2026

U.S. Department Of Agriculture·California

62% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Columbia·Missouri

62% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

LA Public Works Engineering Bureau·California

62% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

Carver County·Minnesota

62% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

City of St. Louis·Missouri

62% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Clermont County - Board of Commissioners·Ohio

61% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

County of Gadsden, FL·Florida

61% match

CR12 5th Avenue – Pedestrian Improvements

Closes 11/24/2026Opened 10/22/2026

Connecticut Town of Cheshire·Connecticut

61% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Connecticut Town of Cheshire·Connecticut

61% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

CPPJ Road, Bridge, & Utility·Louisiana

61% match

West Parish Road Bridge Replacement Project

Closes 11/5/2026Opened 10/8/2026