Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Connecticut
  4. ›Construction
  5. ›2627-05 Mixville Park Pedestrian Bridge

Connecticut Town of Cheshire·Connecticut

2627-05 Mixville Park Pedestrian Bridge

Closes in 2 days$500k – $2MInvitation for Bid
Get bids like this by emailBid source

Description

The Town of Cheshire is soliciting qualified contractors to design and construct a timber pedestrian bridge and two outlook platforms spanning the Upper and Lower Mixville Ponds within Mixville Park. The scope includes relocation of an existing stone slab pathway, installation of timber bridge structures supported by helical pile foundations, construction of precast concrete abutments, creation of two observation platforms, implementation of sedimentation and erosion control measures, restoration of disturbed areas, and final establishment of permanent turf cover. This project requires expertise in bridge construction, site preparation, concrete work, and environmental mitigation. • Timber bridge design and erection • Helical pile foundation installation • Precast concrete abutment construction • Relocation and resetting of existing stone slab pathway • Erosion and sediment control, site restoration, and turf establishment

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Phil Straker

[email protected]

(203) 271-6650

Key dates

Opened
10/13/2026
Closes
11/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
39407

Budget estimate

$500,000 – $2,000,000

Based on typical municipal pedestrian bridge projects of similar size and timber construction, the contract value is likely to fall between $500,000 and $2,000,000. Factors influencing the range include material costs for timber and concrete, labor rates for specialized bridge crews, site conditions at Mixville Park, and the inclusion of environmental mitigation measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut Town of Cheshire·Connecticut

Top match · 97%

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Connecticut Town of Cheshire·Connecticut

85% match

2627-04 Pavilion Replacement at Mixville Park

Closes 11/10/2026Opened 10/13/2026

Connecticut Town of Cheshire·Connecticut

85% match

2627-04 Pavilion Replacement at Mixville Park

Closes 11/10/2026Opened 10/13/2026

Connecticut Town of Cheshire·Connecticut

85% match

2627-04 Pavilion Replacement at Mixville Park

Closes 11/10/2026Opened 10/13/2026

Georgia City of Chattahoochee Hills·Georgia

81% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

Georgia Cobb County Department of Transportation·Georgia

81% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Cobb County, GA·Georgia

80% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Town of Washington·Vermont

80% match

Wishing Well Bridge Engineering, Design and Project Management

Closes 11/2/2026Opened 10/15/2026

Massachusetts Department of Transportation·Massachusetts

80% match

609068 SHEFFIELD FAP No. STP(BR-OFF)-003S(993)X Bridge Replacement, S-10-015, Kelsey Road over Sch

Closes 11/10/2026Opened 9/8/2026

Town of Hilton Head Island·South Carolina

80% match

Crossings Park Improvements Phase 1-Pickle Ball Courts & Arrow Road

Closes 11/18/2026Opened 10/6/2026

City of Newton·Kansas

79% match

Newton Plum Street Bridge Rehabilitation Design

Closes 11/3/2026Opened 10/14/2026

Somerset County·New Jersey

79% match

REHABILITATION OF COUNTY BRIDGE NO. F1306 RIPPLING BROOK WAY OVER TRIBUTARY OF MINE BROOK, BOROUGH OF BERNARDSVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/15/2026

County of Chester·Pennsylvania

79% match

Bridge Rehabilitation for County Bridge #196 and Construction for County Bridge #326

Closes 11/25/2026Opened 10/23/2026

Town of Camp Verde·Arizona

79% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

City of Creve Coeur·Missouri

79% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

County of Chester·Pennsylvania

79% match

Bridge Rehabilitation for County Bridge #190

Closes 11/25/2026Opened 10/22/2026

Town of Westwood·Massachusetts

79% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Agency of Transportation - Contract Administration·Vermont

79% match

Mt. Holly BO 1443(56)

Closes 11/13/2026Opened 10/21/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

78% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

78% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

County of Marin·California

78% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

Maryland Department Of General Services·Maryland

78% match

P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area

Closes 1/11/2027Opened 10/31/2026

Connecticut Town Of Clinton·Connecticut

78% match

Replacement of Bridge No. 06956, Country Village Lane over Unnamed Brook

Closes 11/4/2026Opened 10/9/2026

Camden County·New Jersey

78% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Portage County·Ohio

78% match

Ravenna Rd Bridge Replacement Project-Bid

Rolling / TBD closeOpened 4/2/2026