Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Long-Duration Energy Storage (LDES) Battery System

U.S. Department Of Energy·Idaho

Long-Duration Energy Storage (LDES) Battery System

Closes 9/30/2026$2.5M – $6MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) are issuing an Expression of Interest (EOI) to identify vendors capable of supplying long‑duration energy storage (LDES) battery systems for benchmark testing at their facilities. The solicitation seeks two module‑scale systems (100‑150 kWh, 10‑15 kW, ≤7 ft³ each) and one full‑scale system (1,000‑1,500 kWh, 100‑150 kW, container‑sized). Acceptable technologies must be non‑lithium electrochemical batteries with ≥10 hour discharge capability, operate from 0 °C to 50 °C with limited performance loss, have a minimum 15‑year field lifetime, and provide both AC and DC interfaces with robust safety certifications (NFPA 855, UL 9540/9540A, etc.). Deliverables include detailed technical data, safety assessments, FAT/SAT reports, operation & maintenance manuals, and a project schedule targeting ~3 months for module delivery and ~6 months for full‑scale delivery. Submissions are due 24 Sept 2026; selected vendors may be invited to a later RFP. • Module‑scale: 100‑150 kWh, 10‑15 kW, ≤7 ft × 7 ft × 7 ft, two units. • Full‑scale: 1,000‑1,500 kWh, 100‑150 kW, container‑sized, one unit. • Non‑lithium electrochemical chemistry only (Li‑ion, flow, lead‑acid excluded). • Must meet NFPA 855, UL 9540/9540A, NEC/IEEE standards; provide hazard assessments. • AC: 3‑phase, 60 Hz, 480 V; DC: 800‑1,500 V isolated export; support Modbus TCP/IP, DNP3, IEC 61850. • Lifetime ≥15 years; performance ≥95 % availability; degradation model required. • Documentation: 70 %, 90 %, final design packages; FAT & SAT reports; O&M manuals; remote monitoring. • Schedule: design → delivery → commissioning within ~6 months for full system; SAT within 1 month of install. • Submission: single PDF/Word with technology description, dimensions, interfaces, safety docs, performance data, schedule, and indicative pricing.

Attached files

Contact

Chase Egbert

[email protected]

Key dates

Opened
9/25/2026
Closes
9/30/2026
Duration
6 months

Last updated

Details

Type
Request for Information
Industry
Energy and Utilities
NAICS
335911
Solicitation №
INL-26-050

Budget estimate

$2,500,000 – $6,000,000

The solicitation calls for two 100‑150 kWh modules and one 1,000‑1,500 kWh container‑sized system. Based on current market pricing for advanced non‑lithium battery packs, a module‑scale unit typically ranges from $200,000 to $500,000, while a full‑scale container system can range from $2 million to $5 million. Adding engineering, testing, and support services (≈10‑15 % of hardware cost) suggests a total contract value roughly between $2.5 million and $6 million. The final amount will depend on the specific chemistry, performance guarantees, and warranty terms offered by the vendor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Energy·Idaho

Top match · 66%

Available for Licensing: Dimethyl Ether-Driven Rejuvenation Technology for Lithium-Ion Battery Cell Reuse

Closes 11/1/2026Opened 8/24/2026

U.S. Department Of Energy·Idaho

65% match

Available for Licensing: Dimethyl Ether-Driven Rejuvenation Technology for Lithium-Ion Battery Cell Reuse

Closes 11/1/2026Opened 6/18/2026

U.S. Department Of Defense·United States of America

64% match

61--LEAD,STORAGE BATTERY

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·California

64% match

61--BATTERY,STORAGE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

64% match

61--BATTERY,STORAGE

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

63% match

61--BATTERY,STORAGE

Closes 11/5/2026Opened 10/26/2026

National Aeronautics And Space Administration·Alabama

63% match

TECHNOLOGY TRANSFER OPPORTUNITY: Lunar Experiment Support System and Handling (LESSH) Battery Charger Module (BCM) (GSC-TOPS-362)

Closes 8/11/2027Opened 8/11/2026

Massachusetts Department of Energy Resources·Massachusetts

63% match

LBE Solar-Decarbonization Grant Program for State Entities

Closes 6/29/2028Opened 9/20/2024

U.S. Department Of Defense·United States of America

63% match

61--BATTERY,STORAGE

Closes 11/8/2026Opened 10/28/2026

Madison County School District·Mississippi

62% match

14-2027 Battery Backups (E-Rate)

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

62% match

BATTERY

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

62% match

ENERGY STORAGE BANK

Closes 11/9/2026Opened 10/29/2026

U.S. Department Of Transportation·United States of America

62% match

Ultralife UBBL13-01 Lithium-Ion Batteries - RFI

Closes 11/12/2026Opened 10/29/2026

New York State Energy Research and Development Authority·New York

62% match

Grid Modernization Utility Challenge – National Grid

Closes 11/10/2026Opened 10/8/2026

California Energy Commission·California

62% match

GFO-26-503 - Distributed Electricity Backup Assets Program - Distributed Energy Resources (DERs) for Grid Reliability

Closes 1/26/2027Opened 10/23/2026

Massachusetts Department of Energy Resources·Massachusetts

62% match

LBE Restoration Grant Program for Solar and Decarbonized Systems (PON-ENE-2025-007)

Closes 6/29/2027Opened 11/1/2024

National Aeronautics And Space Administration·United States of America

61% match

TECHNOLOGY TRANSFER OPPORTUNITY: Lunar Experiment Support System and Handling (LESSH) Battery Charger Module (BCM) (GSC-TOPS-362)

Closes 8/11/2027Opened 8/11/2026

U.S. Department Of Defense·Oklahoma

61% match

61--BATTERY,NONRECHARGEABL

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

61% match

Long-Term Storage and Vendor-Managed Inventory (VMI) Services for Government-Owned Microelectronics

Closes 11/30/2026Opened 10/7/2026

U.S. Department Of Defense·California

61% match

61--BATTERY,NONRECHARGEABL

Closes 11/4/2026Opened 10/25/2026

Louisiana Office of State Procurement·Louisiana

61% match

Alkaline Batteries for Canteen - DOC-PE

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

61% match

CHARGER,BATTERY

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

60% match

61--POWER SUPPLY

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·United States of America

60% match

61--POWER SUPPLY

Closes 11/12/2026Opened 10/29/2026

Massachusetts Department of Energy Resources·Massachusetts

60% match

LBE Equipment Decarbonization Grant Program for State Entities

Closes 6/30/2027Opened 12/4/2024