Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›B35 Critical Loop

U.S. Department Of Defense·Kansas

B35 Critical Loop

Closes 3/15/2026$100k – $250kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Air Force is seeking a contractor to install a critical electrical line to Building 35's communications room at McConnell Air Force Base in Wichita, Kansas. The project involves horizontal directional drilling, transformer installation, utility vault installation, electrical wiring, and transfer switch connection. The contractor must comply with all applicable electrical codes, base regulations, and industry standards. The project duration is 60 calendar days after notice to proceed, and the contract is set aside 100% for small businesses. The magnitude of construction is between $100,000 and $250,000. • The contractor must provide all necessary labor, materials, and equipment to complete the project. • The contractor must coordinate with base personnel for power switch-over and obtain all necessary permits and inspections. • The contractor must comply with all applicable codes and standards, including OSHA and environmental regulations. • The contractor must provide a confined space entry permit and follow all safety procedures. • The contractor must maintain an up-to-date hazardous material inventory and provide all necessary documentation.

Attached files

Contact

Kevin Smith(Contracting Officer)

[email protected]

(316) 759-7591

Key dates

Opened
1/10/2026
Questions due
2/27/2026
Pre-bid meeting
2/12/2026
Site visit
2/12/2026
Closes
3/15/2026
Duration
60 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237130
Solicitation №
W50S7X26QA001

Budget estimate

$100,000 – $250,000

The budget for this project can be estimated based on the magnitude of construction, which is between $100,000 and $250,000. Considering the scope of work, which involves horizontal directional drilling, transformer installation, and electrical wiring, the estimated budget is likely to be closer to the higher end of this range. Factors that may influence the likely payment range include the complexity of the project, the need for specialized labor and equipment, and the requirements for compliance with electrical codes and regulations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Georgia

Top match · 57%

Cylinder Assembly (Load Arrestor) PN 1171-3

Closes 11/13/2026Opened 10/13/2026

U.S. Department Of Homeland Security·United States of America

55% match

Bottle Liquid Scanner (BLS) Qualified Products List (QPL)

Closes 11/15/2026Opened 10/14/2026

U.S. Department Of Defense·New York

55% match

106 CE ELECTRICAL LOOP REPAIR

Closes 11/6/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

54% match

CYLINDER

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

54% match

New Manufacture: B-52 Regulating Valve, NSN4820008604396

Closes 11/23/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

54% match

53--CLAMP,LOOP

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·California

54% match

53--CLAMP,LOOP

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·Oklahoma

54% match

53--CLAMP,LOOP

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·Oklahoma

54% match

KC-135 Center Console Refresh (CCR) Revision 2

Closes 11/9/2026Opened 7/2/2025

U.S. Department Of Defense·Pennsylvania

53% match

GE F404 Engine BOA N0038322GTF01 Renewal

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

53% match

VALVE,CHECK

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

53% match

29--FUEL CONTROL,MAIN,T, IN REPAIR/MODIFICATION OF

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

53% match

30--CYLINDER ASSEMBLY,A

Closes 11/9/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

53% match

30--CYLINDER ASSEMBLY,A

Closes 11/3/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

53% match

48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

53% match

36--ECG REFURBISH KIT

Closes 12/10/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

53% match

TESTER,FUEL INTEGRI

Closes 11/12/2027Opened 10/27/2026

U.S. Department Of Defense·United States of America

53% match

CONT,MULTI-LOOP PRO

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·Oklahoma

53% match

B-52J CERP Production Modification Kits & ICS

Closes 6/30/2027Opened 7/1/2026

U.S. Department Of Defense·Utah

53% match

C-5 Brake Hydraulic

Closes 11/13/2026Opened 10/13/2026

U.S. Department Of Defense·California

52% match

BQM-34S Subsonic Aerial Target (SSAT) Full Rate Production (FRP) Lots 1-4

Closes 11/3/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

52% match

48--VALVE,STOP-CHECK

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

52% match

41--CRANKSHAFT,COMPRESS

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·Alabama

52% match

Synopsis Wiring Harness , Branched

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

52% match

30--PULLEY,GROOVE

Closes 11/16/2026Opened 10/15/2026