Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Battery Spark Proof (EE) Rated

U.S. Department Of Defense·New York

Battery Spark Proof (EE) Rated

Closes 11/3/2025$10k – $50kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The opportunity is for the procurement of a specific industrial forklift battery, the Hawker Powerline, Model 35-85F-21EE, with a 1700 Ampere Hour Capacity and 29.68-Kilowatt Hour Capacity at the Six Hour Rate. The battery has specific features such as a high conductive grid structure, maximum density positive plate, and a mult-layer retention system. The opportunity also includes a 5-year full warranty and a 1-year pro-rated warranty. Key features of the battery include: • 1700 Ampere Hour Capacity • 29.68-Kilowatt Hour Capacity at the Six Hour Rate • 2-Series 18-85F-21 in the same tray, wired in Parallel for 36V • Type SB 350-amp 3/0 Gray connector, Position B, Length 30? • Cables exit the right front of battery box • Tray 511820PL-WBKYM: Yes Cover • Weight: 4788 pounds • High conductive grid Structure: low current resistance • Maximum Density Positive Plate • Mult-Layer Retention System- Vertical Wrap, Horizontal Wrap, Koroseal Jacket, Sleeved Separator, All Encased in a Bottom Boot • Custom Made Post, Impermeable Heat Seal Process • Approximate Overall Dimensions: 43.83? L x 43.83? W x 22.69 ?H

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gregory Clifton

[email protected]

(918) 420-7368

Key dates

Opened
10/27/2025
Closes
11/3/2025

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
335910
Solicitation №
W911S226U2197

Budget estimate

$10,000 – $50,000

Based on the specific features and requirements of the battery, the estimated budget for this opportunity could range from $10,000 to $50,000. This estimate is based on the assumption that the battery is a specialized product with a high level of complexity and customization, which would likely result in a higher cost. Additionally, the 5-year full warranty and 1-year pro-rated warranty may also contribute to a higher budget. However, without more information on the production volume and other factors, it is difficult to provide a more precise estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Corrections and Community Supervision, NYS Dept. of·New York

Top match · 63%

Electrical Switchgear Testing Washington Correctional

Closes 1/7/2027Opened 9/18/2026

Madison County School District·Mississippi

63% match

14-2027 Battery Backups (E-Rate)

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Defense·Michigan

61% match

CASE,ELECTRICAL-ELE

Closes 12/12/2026Opened 12/22/2025

New York State Energy Research and Development Authority·New York

61% match

Charge Ready NY 2.0 Equipment and Network Qualification Process

Closes 12/31/2026Opened 4/8/2025

Corrections and Community Supervision, NYS Dept. of·New York

61% match

Electrical switchgear maintenance and Partial discharge testing

Closes 11/18/2026Opened 7/28/2026

U.S. Department Of Defense·Pennsylvania

61% match

BATTERY

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Transportation·United States of America

60% match

Ultralife UBBL13-01 Lithium-Ion Batteries - RFI

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

60% match

CIRCUIT BREAKER

Closes 11/2/2026Opened 10/1/2026

Jacksonville State University·Alabama

60% match

- SUV – EV Police Pursuit Vehicle

Closes 11/13/2026Opened 10/23/2026

South Coast Air Quality Management District·California

60% match

Clean Heavy Duty Vehicle Incentive Program Battery Electric Freight Vehicles for Classes 6 and 7

Closes 1/15/2027Opened 10/7/2026

U.S. Department Of Defense·United States of America

60% match

CHARGER,BATTERY

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·Oklahoma

59% match

Igniter, Spark Gas T (3D)

Closes 11/20/2026Opened 9/28/2026

U.S. Department Of Defense·United States of America

59% match

CIRCUIT BREAKER

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

59% match

IGNITER,SPARK,GAS T

Closes 11/23/2026Opened 10/22/2026

U.S. Department Of Energy·Idaho

59% match

Technology Licensing Opportunity: Room-Temperature Electrochemical Metallization of Rare Earth Elements

Closes 11/15/2026Opened 7/29/2026

U.S. Department Of Defense·Pennsylvania

59% match

59--ELECTRODE

Closes 11/27/2026Opened 10/28/2026

California Energy Commission·California

59% match

GFO-26-301 - Characterizing Non-Driving Electric Vehicle Energy Efficiency

Closes 11/13/2026Opened 2/9/2026

General Services, NYS Office of·New York

59% match

Q1944CE: Replace Electrical Panels

Closes 11/18/2026Opened 10/14/2026

City of Charlotte·North Carolina

59% match

Solar Battery Replacements

Rolling / TBD closeOpened 5/31/2024

U.S. Department Of Defense·United States of America

59% match

61--BRAKE,ELECTRIC

Closes 11/2/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

59% match

CHARGER, BATTERY

Closes 11/17/2026Opened 8/19/2026

U.S. Department Of Defense·United States of America

59% match

SMT BATTERY

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Energy·Idaho

58% match

Available for Licensing: Dimethyl Ether-Driven Rejuvenation Technology for Lithium-Ion Battery Cell Reuse

Closes 11/1/2026Opened 8/24/2026

Agency of Natural Resources (ANR), Department of Environmental Conservation (DEC)·Vermont

58% match

2026 Volkswagen Environmental Mitigation Trust: Eligible Mitigation Actions

Closes 12/31/2026Opened 6/25/2026

U.S. Department Of Homeland Security·District of Columbia

58% match

Explosive Trace Detection (ETD) Qualified Products List (QPL)

Closes 4/30/2027Opened 9/1/2026