Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Water and Wastewater
  5. ›Wellhead Treatment for the Removal of PFAS at Plant No. 3…

Town of Southampton·New York

Wellhead Treatment for the Removal of PFAS at Plant No. 3 – GAC Absorber Contract

Closes 10/14/2026$930k – $1.1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Southampton’s Town Board is seeking a qualified vendor to supply, transport, install, and commission a well‑head treatment system that uses granular activated carbon (GAC) absorbers to remove PFAS contaminants from the water stream at Water District Plant 3. The contract includes two 12‑inch, 40,000‑lb capacity GAC vessels (Model 12‑40) with valve trees, ancillary equipment, and a three‑month storage service for the vessels. Competitive bids were received from Calgon Carbon Corp. and Philip Ross Industries, Inc., with total bid amounts of roughly $0.93 M and $1.08 M respectively. The award will be made after the sealed‑bid opening on October 14, 2026. • Supply and deliver two Model 12‑40 GAC vessels (12‑inch diameter, 40,000 lb capacity) plus valve‑tree accessories. • Provide three‑month on‑site storage for the vessels (pricing quoted per month). • Install, commission, and ensure operational performance of the PFAS removal system at Plant 3. • Minimum qualification: at least five references and full documentation of relevant experience. • Bid security required: certified check or bond equal to 5 % of the total bid; submission deadline is October 14, 2026 2 PM.

Attached files

Contact

Sundy A. Schermeier(Town Clerk)

(631) 723-2712

Key dates

Opened
9/17/2026
Questions due
10/7/2026
Closes
10/14/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
BP2026-0050

Budget estimate

$930,000 – $1,080,000

The contract amounts disclosed range from $931,753 to $1,076,315, which represent the total price the town will pay the winning vendor. Assuming the vendor’s margin is typical for equipment supply + installation (≈ 10‑15 %), the client could expect to earn roughly $90 k to $160 k in profit. Including subcontractor fees and ancillary services, the overall cash flow for the project is likely to fall between $930 k and $1.08 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Western Municipal Water District·California

Top match · 75%

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

City of Riverside·California

73% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026

Maryland City of Salisbury·Maryland

71% match

RFP 27-105 Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/31/2026

West Deptford Township·New Jersey

71% match

Notice to Bidders- Well 5 Treatment

Closes 12/16/2026Opened 10/6/2026

City of Fresno·California

70% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

City of Salisbury·Maryland

70% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Luzerne County·Pennsylvania

69% match

AFFF/PFAS Fire Suppressant Foam Disposal Program

Closes 11/6/2026Opened 10/15/2026

Massachusetts Auburn Water District Inactive·Massachusetts

69% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026

City of Norwalk·California

69% match

Well No. 10 GAC Treatment and System Upgrades

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of Defense·California

69% match

Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per- and Polyfluoroalkyl Substances (PFAS)

Closes 11/30/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

68% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

City of Hollywood·Florida

68% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Gwinnett County Government·Georgia

67% match

Provision of Cleaning and Testing Services for the Firing Range Complex on an Annual Contract

Closes 11/13/2026Opened 10/27/2026

City of Springfield·Illinois

67% match

Removal & Beneficial Use of Synthetic Gypsum

Closes 11/12/2026Opened 10/20/2026

U.S. Department Of Defense·Florida

67% match

Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP)

Closes 12/18/2026Opened 9/16/2026

Village of Cary·Illinois

67% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

Washington Suburban Sanitary Commission, MD·Maryland

67% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

Washington Suburban Sanitary Commission·Maryland

67% match

Potomac WFP Water Quality/PFAS Pilot Project REBID

Closes 12/1/2026Opened 10/14/2026

City of Temple Terrace, FL·Florida

67% match

Professional Engineering Services for PFAS Compliance Nanofiltration Treatment, and Concentrate Management

Closes 11/16/2026Opened 10/6/2026

Georgia Gwinnett County·Georgia

66% match

PA012-26, Purchase of Sulfamic Acid for the Yellow River Water Reclamation Facility on an Annual Con

Closes 11/10/2026Opened 10/26/2026

Ohio Environmental Protection Agency·Ohio

66% match

EPA- Statewide Aqueous Film-Forming Foam (AFFF) Collection, Transportation, and Destruction Services RFP

Closes 11/23/2026Opened 10/27/2026

U.S. Department Of Defense·New York

66% match

Forest Improvement Herbicide- Fort Drum

Closes 8/22/2029Opened 8/22/2024

Grand River Dam Authority - GRDA·Oklahoma

66% match

Cooling Water System Performance Monitoring and Chemical Treatment Supply for GREC Units 2, 3 & 4

Closes 11/13/2026Opened 10/20/2026

City of Rockford·Illinois

66% match

WELL 6 RESERVOIR REHAB

Closes 11/10/2026Opened 10/13/2026

East Bay Municipal Utility District·California

66% match

FMC733-26-02 Stott Reservoir Joint Sealant Removal and Replacement

Closes 11/24/2026Opened 10/27/2026