Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alabama
  4. ›Water and Wastewater
  5. ›0045 Water Testing - Old Cahawba

State of Alabama·Alabama

0045 Water Testing - Old Cahawba

Closes 10/26/2026$20k – $25kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of Alabama seeks a qualified vendor to perform monthly water testing at Old Cahawba Park to satisfy Alabama Department of Environmental Management (ADEM) compliance requirements. The contract covers a twelve‑month period from October 2026 through September 2027, with testing performed on‑site each month. No subcontractors are permitted, and the vendor must be prepared to present current licensing upon request. This is a Quick Quote solicitation, meaning the state expects a price‑based quotation rather than a detailed technical proposal. • Service location: Old Cahawba Park, 9518 Cahaba Road, Orrville, AL 36767 • Frequency: Monthly testing for one year (12 months) • Compliance: Must meet ADEM water‑quality standards; vendor must hold appropriate environmental testing licenses • Restrictions: No subcontracted bids; vendor must provide proof of licensing on demand • Procurement format: Quick Quote (price‑based RFQ) with a maximum contract ceiling of $25,000 per the state’s standard terms.

Attached files

Key dates

Opened
10/21/2026
Closes
10/26/2026
Duration
12 months

Last updated

Details

Type
Request for Quotation
Industry
Water Management and Sanitation
NAICS
541380
Solicitation №
SRC0000037270

Budget estimate

$20,000 – $25,000

The solicitation’s standard terms cap the total contract value at $25,000, and because the work is limited to monthly water testing for a single year, the award is likely to fall near the upper limit of that ceiling. Assuming each month’s testing costs between $1,500 and $2,000 (including sample collection, lab analysis, and reporting), the total would range from $18,000 to $24,000. Therefore a reasonable estimate is $20,000‑$25,000. Factors influencing the final amount include the vendor’s lab rates, travel costs to the site, and any additional reporting requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Ohio Department of Rehabilitation and Correction·Ohio

Top match · 69%

Water Testing Services - CCI - DRC27

Closes 11/9/2026Opened 10/19/2026

U.S. Department Of Veterans Affairs·Washington

66% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

U.S. Department Of Veterans Affairs·Indiana

66% match

B533--VANIHCS SPS Water Testing (VA-27-00000760)

Closes 11/4/2026Opened 10/4/2026

Catalina Foothills Unified School District·Arizona

65% match

IFB 27-03-32 BACKFLOW-TESTING-MANAGEMENT

Closes 11/5/2026Opened 10/10/2026

U.S. Department Of Defense·Massachusetts

64% match

Individual Water Treatment Device (IWTD) Laboratory Testing

Closes 11/12/2026Opened 10/8/2026

The Housing Authority of Columbus·Georgia

64% match

Back Flow Testing

Closes 11/6/2026Opened 10/8/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Connecticut Town of Old Saybrook·Connecticut

64% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

City of Cortez·Colorado

63% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

Loudoun Water·Virginia

63% match

Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

Loudoun Water·Virginia

63% match

RFP 2026-071-1400002-Cathodic Protection Testing Services

Closes 11/20/2026Opened 10/26/2026

Georgia Clayton County Water Authority·Georgia

63% match

2026-GS-14 Switchgear Preventative Maintenance and Overload Testing

Closes 11/12/2026Opened 10/15/2026

Commonwealth of Kentucky·Kentucky

63% match

Water and Wastewater Operations, Maintenance, Monitoring

Closes 11/16/2026Opened 10/28/2026

Western Virginia Water Authority·Virginia

63% match

ITB - SPRING HOLLOW WTF CLEARWELL

Closes 11/17/2026Opened 10/15/2026

U.S. Department Of Defense·Massachusetts

63% match

Individual Water Treatment Device (IWTD) for Reduction/Removal of Toxic Industrial Chemicals and Materials

Closes 11/12/2026Opened 10/8/2026

U.S. Environmental Protection Agency·United States of America

63% match

Capital Equipment: Purchase of (1) Millipore Sigma

Closes 11/9/2026Opened 10/29/2026

Town of Eatonville·Florida

62% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

Medina County, OH Sanitary Engineering·Ohio

62% match

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

62% match

Sources Sought: Alternative Sources of Water for Small Units. (ACC-DTA CSO Amend 42)

Closes 11/6/2026Opened 10/30/2026

Maryland Frederick County Government·Maryland

62% match

IFB #27-121-CP Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/10/2026