Scope of Work: Building 1A, Building1C, Building 1L, Building 2A, Building 6S
Abatement work includes the removal of asbestos containing materials and assumed asbestos containing materials at buildings 1A, 2A, 1C and 1L.
GENERAL SCOPE:
The work includes selective demolition, repair, replacement, and installation of masonry, roofing, skylight systems, flashing, and associated components as indicated in the contract drawings and specifications. All work shall be coordinated with existing conditions and adjacent building elements.
Building 1A – Masonry & Exterior Elements
Replacement of deteriorated masonry, including windowsills and lintels
Replacement of area lights and miscellaneous exterior elements as indicated
Installation of new flashing systems including:
Flashing and counter flashing
Weep systems
Installation of new brick to match existing in color, size, and pattern
Building 1C – Skylight & Roof Restoration
Removal and replacement of (4) existing skylights
Removal of surrounding roofing system down to existing metal deck (deck to remain)
Installation of:
New roofing system
Curbs and flashing
Prefabricated skylights
Rotunda scope:
Removal of deteriorated plywood
Salvage and reinstallation of copper shingles
Removal and disposal of existing building paper
Installation of new flashing, vapor barrier, and plywood
Replacement of:
Expansion joints
Glass block mortar joints at lantern
Building 1L – Lantern & Skylight Repairs
Replacement of all mortar joints and expansion joints at glass block lanterns
Replacement of sealant at base of lantern
Replacement of skylight components as indicated
Removal and reinstallation of glass panels
Provision of temporary protection below skylight and lantern areas
Building 6S – Skylight Replacement
Removal of existing skylight system down to concrete and steel substructure
Installation of new skylight system in accordance with contract drawings
Integration with existing structural and roofing components
Building 2A – Masonry & Flashing Work
Replacement of existing counterflashing at masonry walls adjacent to skylight
Removal and replacement of associated brickwork
Installation of:
New flashing and counter flashing
Weep systems
Brick to match existing
SUBMISSION REQUIREMENTS
Detailed scope confirmation and exclusions
Unit pricing & Allowances items
Lead times for major materials (skylights, specialty items)
Relevant project experience and references
PLA Applicable
Please email
[email protected] for any questions.
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
MBE Goal: 18.00%
WBE Goal: 12.00%