The State of Michigan is seeking a contractor to construct and operate a groundwater remediation system at the Adrian Oil Burner site in Lenawee County. The system will include a combined groundwater recovery and soil vapor extraction (SVE) system, with components such as pumps, headers, piping, valves, meters, gauges, wiring, sampling ports, knock-out tanks, bag filters, blower motors, vacuum sensors, pressure sensors, program logic controllers, control panels, catalytic oxidation unit, explosion proof rooms, variable frequency drives, utility connections, and other associated components. The contractor will be responsible for constructing the system, operating and maintaining it for up to 6 months, and demonstrating its operational status.
Some key aspects of the project include:
* Construction of the groundwater recovery and SVE system
* Operation and maintenance of the system for up to 6 months
* Demonstration of the system's operational status
* Compliance with all applicable laws, regulations, and standards
* Coordination with the State of Michigan and other stakeholders
The successful contractor will need to have experience with similar projects, including groundwater remediation and SVE systems, and will need to demonstrate their ability to complete the project on time, within budget, and to the required standards.