Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Construction
  5. ›Learning Campus Sidewalk Replacement Phase 1

City of Bettendorf·Iowa

Learning Campus Sidewalk Replacement Phase 1

Closes 7/14/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bettendorf is seeking bids for the Learning Campus Sidewalk Replacement Phase 1 project. The project involves removing and replacing 4-inch and 6-inch thick P.C.C. sidewalk and ADA curb ramps compliant with the Americans with Disabilities Act Accessibility Guidelines (ADAAG). The work includes removal and replacement of existing P.C.C. sidewalk, driveway, and curb ramps, installing detectable warning tile at ADA curb ramps, sidewalk curb, P.C.C. curb and gutter removal and replacement, and reshaping disturbed areas and grades. The contractor must commence work no later than the date set forth in a Notice to Proceed from the City or its authorized representative. • The project requires the contractor to remove and replace existing P.C.C. sidewalk and ADA curb ramps. • The contractor must install detectable warning tile at ADA curb ramps. • The contractor must remove and replace P.C.C. curb and gutter. • The contractor must reshape disturbed areas and grades. • The contractor must complete the work within 30 calendar days from the agreed-upon start date. • The contractor must comply with the plans and specifications prepared by the Engineer of the Engineering Division of the Public Works Department of Bettendorf, Iowa.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brian Fries(Purchasing Division)

[email protected]

(563) 344-4055

Key dates

Opened
6/30/2026
Questions due
7/8/2026
Closes
7/14/2026
Duration
30 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2026-0016

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which includes removing and replacing sidewalks, curb ramps, and gutters. The cost of materials, labor, and equipment will be significant factors in determining the budget. Assuming an average cost of $50 per square foot for sidewalk replacement and $100 per linear foot for curb ramp replacement, the total budget could range from $200,000 to $500,000, depending on the extent of the work required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Ormond Beach - Purchasing Office·Florida

Top match · 69%

2027 Sidewalk Repair and Replacement

Closes 11/18/2026Opened 10/11/2026

NYS Rochester, City of·New York

68% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

San Bernardino County·California

67% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

NYS East Fishkill, Town of·New York

67% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Charlotte·North Carolina

67% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

City of Charlotte·North Carolina

67% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Central Midlands Council of Governments·South Carolina

66% match

Sidewalk Additions along Drayton Street, Park Street, Vanderhorst Street, and Chalmers Street

Closes 11/5/2026Opened 10/2/2026

Connecticut Town of Plainfield·Connecticut

66% match

Sidewalk Repair for the Recreation Department & Senior Center Building

Closes 11/4/2026Opened 9/26/2026

City of Mobile·Alabama

66% match

Residential Sidewalk Repair Program

Closes 11/6/2026Opened 10/22/2026

City of Portland·Maine

66% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

City of Salinas·California

66% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

The University of North Carolina·North Carolina

66% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

Madison Area Technical College, Purchasing Dept·Wisconsin

66% match

RFB27-014 Roberts Field Turf Replacement Project Truax Campus

Closes 11/12/2026Opened 10/15/2026

Maryland Carroll County Government - Procurement·Maryland

66% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

City of Charlotte·North Carolina

66% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026

City of Sunnyvale Procurement Bids and RFPs·California

66% match

Install Sidewalk on Poplar Avenue

Closes 11/18/2026Opened 10/23/2026

Georgia City of College Park·Georgia

65% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Coronado·California

65% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Cerritos·California

65% match

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

City of Fayetteville·North Carolina

65% match

ITB-Breezewood Avenue Sidewalk Improvements

Closes 11/12/2026Opened 10/5/2026

City of Pasadena·California

65% match

CDBG Sidewalk Improvement Project FY 2027

Closes 11/20/2026Opened 10/29/2026

Richland County·South Carolina

65% match

Friarsgate Boulevard Sidewalk Project

Closes 8/28/2027Opened 7/28/2026

Iowa State University·Iowa

65% match

CP1275129-Linden Residence Hall-North Retaining Wall-Repairs

Closes 11/12/2026Opened 10/15/2026

Georgia Laurens County Board of Commissioners·Georgia

65% match

City of Cadwell Sidewalk Project

Closes 11/4/2026Opened 10/14/2026

Connecticut Groton Public Schools·Connecticut

65% match

Groton Public Schools

Closes 11/2/2026Opened 10/17/2026