The U.S. Embassy Ankara is seeking to acquire three brand-new, factory-produced MY2026 or newer C-segment compact sport utility vehicles (SUVs) for official all-weather transportation and mission-support use. The awarded product is the technically accepted configuration proposed by Baytur: three MY2026 Subaru Forester 2.0i Mild Hybrid Style vehicles. The contract was awarded under the RFQ's Lowest Price Technically Acceptable (LPTA) method, with a total contract value of USD 95,700.00. Key features of the required vehicles include a gasoline mild-hybrid/electric-assist powertrain, automatic transmission, all-wheel drive, and a minimum of 100 kW/136 PS and 180 Nm torque. The vehicles must also meet Turkish/EU-market homologation and Euro 6.2/Euro 6d or current accepted equivalent standards.
• Brand-new, unused, factory-produced, left-hand drive C-segment compact SUV with five seats, four passenger doors, and a rear cargo gate/liftgate.
• Gasoline mild-hybrid/electric-assist powertrain with engine displacement not exceeding 2.0 liters, minimum output of 100 kW/136 PS and 180 Nm torque, automatic transmission, and all-wheel drive.
• Turkish/EU-market homologation and Euro 6.2/Euro 6d or current accepted equivalent; lawful registration and road operation in Türkiye without non-standard conversion.
• Minimum 220 mm ground clearance, minimum 500-liter cargo capacity with rear seats up, and overall dimensions within the RFQ ranges.
• Required braking, stability, traction, airbags, collision-avoidance, lane/adaptive-cruise, blind-spot/rear-detection, camera/parking, lighting, wheel/tire, and TPMS features in RFQ Table 1.
• Dual-zone climate control, leather/leatherette seating, heated front and rear seats, power front seats, display audio/connectivity, power-folding mirrors, roof rails, privacy glass, and sunroof/equivalent.
• Manufacturer-backed warranty valid in Türkiye for at least three (3) years or 100,000 km, with authorized service and OEM parts support in Türkiye.
• Complete delivery or release-ready handover, including all required documents, within forty-five (45) calendar days after the purchase order is emailed to the awardee.