The project involves the construction of a combined groundwater recovery and soil vapor extraction (SVE) system, including necessary pumps, headers, piping, valves, meters, gauges, wiring, sampling ports, knock-out tanks, bag filters, blower motors, vacuum sensors, pressure sensors, program logic controllers, control panels, catalytic oxidation unit, explosion-proof rooms, variable frequency drives, utility connections, and all other associated components required to connect the existing groundwater recovery and SVE well networks to the existing treatment facility. The project also includes operation and maintenance of the system for a period of up to 6 months. Key features of the project include:
* Construction of a combined groundwater recovery/SVE system
* Installation of pumps, headers, piping, valves, meters, gauges, wiring, sampling ports, knock-out tanks, bag filters, blower motors, vacuum sensors, pressure sensors, program logic controllers, control panels, catalytic oxidation unit, explosion-proof rooms, variable frequency drives, utility connections
* Connection of existing groundwater recovery and SVE well networks to the existing treatment facility
* Operation and maintenance of the system for up to 6 months
* Compliance with environmental regulations and standards