The City of New London is soliciting bids for the complete removal of three underground storage tanks at its police station, soil screening and closure sampling, and the installation of a new 2,000‑gal above‑ground concrete storage tank with associated civil work. The contractor must secure all required environmental and building permits, handle hazardous‑waste transportation, perform detailed soil analysis, provide a temporary 1,000‑gal storage tank during the transition, and deliver all warranties, as‑built drawings, and compliance documentation.
• Remove three USTs (4,000‑gal, 2,000‑gal heating‑oil and 1,000‑gal waste‑oil) and transport to approved disposal facility.
• Conduct field screening, collect 15 closure soil samples, and submit laboratory analyses for petroleum hydrocarbons, VOCs, SVOCs, metals, and PCBs.
• Install a new 2,000‑gal concrete above‑ground storage tank, including pad construction, pipework, stair slab, and ancillary hardware.
• Provide all permits, insurance, bonds, and post‑installation documentation; comply with local, state, and federal environmental regulations.