Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Pre-Solicitation Oil Water Separator Design/Install…

U.S. Department Of Defense·Idaho

Pre-Solicitation Oil Water Separator Design/Install - Mountain Home AFB, ID

Closes 1/29/2026$250k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Air Force is seeking a contractor to design, fabricate, install, and commission a complete and functional 300 Gallons Per Minute (GPM) Oil Water Separator (OWS) system at the Mountain Home Air Force Base in Idaho. The system must be fully integrated into the existing facility infrastructure and meet EPA, DoD, and NPDES regulations. The contractor will be responsible for furnishing all personnel, equipment, supervision, and materials necessary to complete the project. The project will be divided into four phases: Pre-Construction Planning & Submittals, Site Preparation, System Installation, and Commissioning & Testing. * Key aspects of the project include: * Designing and installing a 300 GPM OWS system * Ensuring compliance with EPA, DoD, and NPDES regulations * Providing a complete and functional system that meets the requirements of the Statement of Work * Furnishing all personnel, equipment, supervision, and materials necessary to complete the project * Meeting the projected contract completion date of 50 calendar days after issue of Notice to Proceed (NTP)

Attached files

Contact

Gage Bergman

[email protected]

Key dates

Opened
1/14/2026
Closes
1/29/2026
Duration
50 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
Not explicitly stated, but the Solicitation ID Number is mentioned as a field that will be provided later

Budget estimate

$250,000 – $500,000

The estimated budget for this opportunity is between $250,000 and $500,000, as stated in the document. This estimate is based on the scope of work, which includes designing, fabricating, installing, and commissioning a complete and functional 300 GPM Oil Water Separator system. The factors that may influence the likely payment range include the complexity of the system, the materials and equipment required, and the labor costs associated with the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Military & Naval Affairs, NYS Division of·New York

Top match · 73%

IFB 26-22 Latham AASF FMS Oil/Water Separator

Closes 11/24/2026Opened 10/21/2026

U.S. Department Of Defense·Minnesota

72% match

Cleaning, Inspection, and Hazardous Waste Removal for Two 10,000-Gallon Oil/Water Separators

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

72% match

MOISTURE SEPARATOR

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

71% match

WATER SEP ASSEMBLY,

Closes 11/9/2026Opened 10/30/2026

U.S. Department Of Defense·Oklahoma

69% match

Filter, Fluid

Closes 11/12/2026Opened 10/13/2026

New Mexico General Services Department·New Mexico

68% match

INSTALLATION AND SERVICE OF WATER SYSTEMS

Closes 11/10/2026Opened 10/1/2026

U.S. Department Of Defense·Hawaii

67% match

Elevated Water Storage Tanks, Kolekole and East Range, Schofield Barracks, Oahu, Hawaii

Closes 9/8/2027Opened 9/8/2026

U.S. Department Of Defense·United States of America

67% match

Sources Sought: Alternative Sources of Water for Small Units. (ACC-DTA CSO Amend 42)

Closes 11/6/2026Opened 10/30/2026

City of Yakima·Washington

67% match

REQUEST FOR QUALIFICATIONS – Tiger Oil design, build, and monitor Project

Closes 11/17/2026Opened 10/8/2026

Alaska Department of Natural Resources, Division of Oil and Gas·Alaska

67% match

Oil Search (Alaska) LLC, Stirrup 2 Exploration Well Unit Plan of Operations Amendment

Closes 11/1/2026Opened 10/9/2026

U.S. Department Of Defense·Oklahoma

67% match

New Manufacture: B-1 Fluid Filter Body, NSN 1650012046227

Closes 11/23/2026Opened 10/7/2026

U.S. Department Of Transportation·Oklahoma

67% match

Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades

Closes 11/19/2026Opened 10/20/2026

Alaska Department of Environmental Conservation·Alaska

67% match

Public Notice for an Oil Discharge Prevention and Contingency Plan - 26-CP-5078 Delta Western, LLC Alaska Tankship Operations

Closes 11/9/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

67% match

WASHER,FLAT - 40A /HELICOPTER, BLACK HAWK UH-60A, UH-60L, HH/UH-60M, UH-60V

Closes 12/11/2026Opened 10/28/2026

Middlesex County·New Jersey

66% match

CLEAN OUT AND PROPER DISPOSAL OF SLUDGE AND DEBRIS FROM OIL SEPARATOR TANKS

Closes 11/10/2026Opened 10/19/2026

Town of Groton·Connecticut

66% match

M-D WASD, JEPWTP BULK SODIUM HYPOCHLORITE STORAGE FACILITY, W-13668

Closes 11/10/2026Opened 9/1/2026

U.S. Department Of Defense·Massachusetts

66% match

Individual Water Treatment Device (IWTD) for Reduction/Removal of Toxic Industrial Chemicals and Materials

Closes 11/12/2026Opened 10/8/2026

U.S. Department Of Veterans Affairs·Arkansas

66% match

N048-- B41 Isolation Valve Installation

Closes 11/9/2026Opened 10/22/2026

City of Richland·Washington

66% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

U.S. Department Of Defense·Nebraska

66% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

Western Municipal Water District·California

66% match

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

Oregon City of Ashland·Oregon

66% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Troy, OH·Ohio

66% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

66% match

Fuel Oil Leak Off Box

Closes 11/2/2026Opened 10/28/2026

Village of Wellington·Florida

66% match

Water Reclamation Facility Sodium Hydroxide Storage Area Modifications

Closes 11/18/2026Opened 10/16/2026