Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›Phase 1a (Terrace Park)

New York State Parks, Recreation and Historic Preservation·New York

Phase 1a (Terrace Park)

Closes 8/5/2026$5M – $20MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Cold Spring Construction Co. intends to bid on New York State Parks, Recreation and Historic Preservation, D006636 Phase 1a (Terrace Park) High Falls State Park, which will be let on August 5, 2026. This contract provides for park construction with amenities, landscaping and trails, in the City of Rochester, in Monroe County. It is scheduled for completion in 365 days. Full plan and specifications for the project are available for free download at the link below: https://coldspringconstruction.sharefile.com/d-s929c79c182c54ff789e403fa27d63320 This project contains a Project Labor Agreement (PLA). PLA projects require a Project Labor Agreement List of Subcontractors (Sub List) completed by the Prime and Project Labor Agreement - Letter of Assent to be completed by both the Prime and Subcontractor. All PLA related documents should be included in a separate attachment in accordance with the Supplemental Instructions to Proposers – Project Labor Agreement. Failure to submit these forms correctly will result in a disqualification of the bid. All bids submissions must include: Contractor’s List of Subcontractors (PLA) and Subcontractor’s Letter of Assent. Electronic files of plans and proposals can also be made available for download from Cold Spring Construction. Requests for download and/or further information concerning the project may be obtained from Brett J. Bottone, Vice President - Engineering at 716-542-2011 or via email at [email protected]. Available MBW/WBE/SDVOB/subcontractor scopes for this project: Mobilization · Erosion and Sediment Control, Site Protection, Preparation and Staging · Installation of Temporary Controls (i.e. Tree Protection, project sign) · Maintenance and Protection of Traffic · Dewatering and/or Snow Removal · Selective and Structure Demolition including palletizing items to be salvaged · Excavation and disposal of contaminated soils · Pile Foundations · Cover/cap Materials · Earthwork, stormwater management facilities · Utility infrastructure, terminations and new service stubs including site lighting, ROW lighting and ROW signals · ROW intersection reconstruction · Bathroom building and Pavilion structures · Playground surfacing and equipment · Concrete/Asphalt/Wood Decking Walkways and lay-ins · Soil, Sod and Plantings · Site Furnishings and Railings, including boulders and seating · Orientation and interpretive signs · Final project cleaning and disposal · Demobilization · Closeout · On-going plant care for warrantee Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 11.00% WBE Goal: 19.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brett J. Bottone(Vice President - Engineering)

[email protected]

(716) 542-2011

Key dates

Opened
7/27/2026
Closes
8/5/2026
Duration
365 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
D006636

Budget estimate

$5,000,000 – $20,000,000

The budget for this project can be estimated based on the scope of work and the contract term. Considering the various scopes of work involved, such as mobilization, erosion and sediment control, site protection, preparation and staging, installation of temporary controls, maintenance and protection of traffic, dewatering and/or snow removal, selective and structure demolition, excavation and disposal of contaminated soils, pile foundations, cover/cap materials, earthwork, stormwater management facilities, utility infrastructure, terminations and new service stubs, bathroom building and pavilion structures, playground surfacing and equipment, concrete/asphalt/wood decking walkways and lay-ins, soil, sod and plantings, site furnishings and railings, orientation and interpretive signs, final project cleaning and disposal, demobilization, and closeout, the estimated budget could be in the range of $5 million to $20 million. The factors influencing this estimate include the complexity of the project, the number of subcontractors involved, and the materials required for the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Georgia City of Bloomingdale·Georgia

Top match · 69%

Taylor Park Improvements- Phase 1

Closes 11/30/2026Opened 10/30/2026

Los Angeles County Public Works·California

67% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Lake Charles·Louisiana

66% match

Riverside Park Shoreline Protection – Phase One

Closes 11/17/2026Opened 10/22/2026

City of Fremont·Ohio

66% match

Birchard Park Phase I

Rolling / TBD closeOpened 10/21/2026

City of Mauldin·South Carolina

65% match

SUNSET PARK SPORTS FIELDS LIGHTING PHASE 1

Closes 11/2/2026Opened 9/29/2026

Georgia River Valley Regional Commission·Georgia

65% match

Josh Gibson Park Phase I Construction

Closes 12/9/2026Opened 10/22/2026

Town of Cutler Bay·Florida

65% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

City of Key West·Florida

65% match

Bayview Park Phase 2

Closes 11/9/2026Opened 9/24/2026

City of Duarte·California

65% match

Duarte Park Redevelopment: Phase II

Closes 11/23/2026Opened 10/28/2026

Pierce County·Washington

64% match

Orangegate Park Phase 1 Site Improvements

Closes 11/10/2026Opened 10/7/2026

Calhoun County Board of County Commissioners·Florida

64% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

County of Isle of Wight·Virginia

64% match

H.H. BRADBY PARK PHASE 1

Closes 11/16/2026Opened 10/14/2026

City of Tustin·California

64% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

City of Austin·Texas

63% match

John Trevino Jr. Metro Park - Phase I Development

Rolling / TBD closeOpened 10/19/2026

City of Northfield·Minnesota

63% match

Northfield, City of Skateboard Park Phase 2 26X.143028

Closes 11/4/2026Opened 10/16/2026

City of Creve Coeur·Missouri

63% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

Lakesong Municipal Management District No. 1 of Ellis County·Texas

63% match

Lakesong Boulevard, Phase 2 Landscape Public Bid

Closes 11/4/2026Opened 10/19/2026

City of Irvine·California

63% match

Pre-Qualification of Bidders - Great Park Cultural Terrace Phase IV - Landscape & Site Improvements

Closes 11/5/2026Opened 10/7/2026

Isle of Wight County, VA·Virginia

63% match

Henry H. Bradby Park Phase 1

Closes 11/16/2026Opened 10/15/2026

City of Bellevue·Washington

63% match

Meydenbauer Bay Park Phase 2 - GC/CM Services

Closes 12/4/2026Opened 10/22/2026

City of Coronado·California

63% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

U.S. Department Of The Interior·Colorado

63% match

Y--VICK 209252 Stabilize Mint Spring Bayou & VICK 310725/324137 Stabilize Terraces

Closes 3/13/2027Opened 3/13/2025

Georgia City of College Park·Georgia

63% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

Camden County·New Jersey

63% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

City of Greer·South Carolina

62% match

Re-Solicitation: Century Park Field 1 Fence Replacement

Closes 11/17/2026Opened 10/30/2026