The Recreation and Park Commission of East Baton Rouge Parish is seeking a contractor to construct a new two‑lane connector road providing access to Greenwood Community Park. The scope includes earthwork, grading, drainage, a lime‑treated sub‑grade, Class II base, asphalt concrete paving, concrete sidewalks, curb ramps, signage, striping, erosion control, utility adjustments, and final site restoration with hydro‑seeding. The project budget is capped at $1.95 M, with a designer‑estimated probable cost of $1.675 M. Bids were opened on August 25, 2026, and the contract will be awarded after evaluation of the submitted bids.
• New two‑lane asphalt roadway with lime‑treated sub‑grade and base course.
• Installation of drainage pipe, concrete walkways, curb ramps, and traffic‑control devices.
• Site work includes clearing, grubbing, excavation, embankment, erosion control, utility relocation, and hydro‑seeding for restoration.