The Twin Rivers Unified School District is soliciting sealed electronic bids to refurbish staff lounge areas at Highlands High School and F.C. Joyce TK‑8. The scope includes interior demolition, replacement of flooring, wall base, casework, sinks, repainting, door hardware upgrades, lighting, and installation of new signage, as well as relocation and re‑installation of furniture and equipment. All work must comply with California State Construction Cost Accounting Act (CUPCCAA) requirements, DSA regulations, and prevailing‑wage rules. Bids are due electronically by April 20, 2026, with a pre‑bid site walk on April 8, 2026; RFIs must be submitted by April 10, 2026. The contract value is estimated at $75 K (plus a possible 10 % contingency), with a construction period of roughly two months (June 6 – August 3, 2026).
• Interior finish upgrades (epoxy flooring, wall base, casework, painting, door hardware) for two school staff lounges.
• Coordination of furniture relocation, signage, lighting, and minor electrical verification (no new panels).
• Compliance obligations: CUPCCAA registration, DIR registration, DSA inspection, bid security, performance/pay bonds, and prevailing‑wage certifications.