This solicitation is for the design, supply, installation, and commissioning of a full electric‑vehicle charging infrastructure at Valley State Prison (Chowchilla, CA) and its Central Consolidated Maintenance (CCM) site. The work includes civil demolition, site grading, trenching, concrete pad construction, installation of 20 commercial‑grade EV charging units (2 single‑port and 18 dual‑port Level 2), a 750 kVA transformer, associated medium‑ and low‑voltage distribution panels, conduit, grounding, and all required electrical and fire‑safety compliance. The contractor must provide all labor, materials, equipment, and incidentals, obtain permits, coordinate utilities (2‑day USA notice), perform special inspections for mechanical anchors, and meet California state codes (CBC, CEC, CFC, ADA, etc.).
• 20 EV charging stations (38 fleet ports) with UL‑listed equipment and cable‑management.
• Complete civil works – demolition, concrete pads, trenching, utility coordination, and site restoration.
• Electrical infrastructure – 750 kVA transformer, two distribution panels, high‑voltage conduit, grounding, and testing per NEC/CEC.
• Mandatory virtual pre‑bid site inspection on 9/22/2026; RFBI questions due by 9/29/2026; bids due 10/7/2026.