The City of Cincinnati is soliciting bids for the design‑build installation of direct‑current fast‑charging (DCFC) electric‑vehicle infrastructure at three municipal recreation centers (Madisonville, Hartwell, and Price Hill). The work includes site preparation, concrete pad construction, underground conduit and wiring, installation of DCFC chargers (minimum 50 kW, dual‑port, OCPP 2.0.1‑compliant), distribution panels, meter sockets, current‑transformer cabinets, bollards, signage, pavement markings, and a five‑year operations & maintenance (O&M) service contract. The contract requires a 30 % self‑performance minimum, bid‑bond of 10 % and performance‑bond of 100 % of contract value, and compliance with ODOT, city, and federal regulations (e.g., Davis‑Bacon, Buy‑America, E‑Verify).
• Install DC fast‑charging stations (50 kW, dual‑port) with full electrical and civil works at three sites.
• Provide five‑year O&M, 97 % uptime guarantee, 24/7 driver support, and quarterly data reporting.
• Mandatory compliance with ODOT pre‑qualification, performance surety, E‑Verify, and extensive reporting requirements.