Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›R-7282 Fleet Services EV Charging Depot

City of Long Beach·California

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026$2M – $3MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Long Beach is seeking a qualified contractor to design, install, and commission an electric‑vehicle fast‑charging depot at its Fleet Services campus, including five dual‑port DC fast chargers, associated electrical infrastructure, and a 600 kWh‑plus Battery Energy Storage System (BESS). The work encompasses demolition, civil site improvements, electrical distribution, fire‑safety systems, and full testing/commissioning, with a performance schedule of 180 calendar days. The contract will be awarded to the lowest responsive and responsible bidder and must comply with California prevailing‑wage, Project Labor Agreement, and Small‑Business Enterprise goals. • Install five 400 kW dual‑port DC fast chargers (owner‑provided ChargePoint equipment). • Provide all low‑voltage switchgear, transformers, conduit, wiring, concrete foundations, curb, and parking‑lot modifications. • Integrate a 600 kWh / 800 kW BESS with fire‑protection, HVAC, and remote monitoring controls. • Meet strict safety, fire, and electrical code requirements (NEC, NFPA 855, UL 9540A) and submit extensive documentation (warranties, O&M manuals, certified payroll, SBE compliance).

Attached files

Contact

Justin Beck(Capital Projects Coordinator)

[email protected]

(562) 570-6383

Key dates

Opened
10/14/2026
Questions due
10/10/2026
Pre-bid meeting
10/27/2026Mandatory
Site visit
10/27/2026Mandatory
Closes
11/20/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
PW-26-800

Budget estimate

$2,000,000 – $3,000,000

The engineer’s estimate for the project is roughly $2.5 million. Considering typical bid‑price contingencies, a competitive bid could range from about $2.0 million on the low end (if a contractor leverages existing inventory and efficient scheduling) up to $3.0 million on the high end (including premium sub‑contracts, higher labor rates, and extensive warranty provisions). Factors influencing the final amount include the cost of the BESS, local labor rates under prevailing‑wage rules, and the extent of required safety and fire‑protection systems.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Long Beach·California

Top match · 89%

HD-S3203 HARBOR FLEET ZERO EMISSIONS INFRASTRUCTURE

Closes 11/17/2026Opened 10/8/2026

Maryland Department Of General Services·Maryland

85% match

Installing 10 Single-Port 48A Level 2 and 2 Level 3 80 kW DC Fast Chargers at Maryland Correctional Transportation Unit

Closes 11/9/2026Opened 10/17/2026

City of Long Beach·California

84% match

R-7292 Marine Stadium Electrical Infrastructure

Closes 11/18/2026Opened 10/14/2026

City of Cincinnati·Ohio

84% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/19/2026

California Department of State Hospitals·California

84% match

IFB 26-42015-000 Electric Vehicle Charging Stations Maintenance and Repair Services

Closes 11/6/2026Opened 10/21/2026

City of Cincinnati·Ohio

83% match

EV Charging Rec Centers PID 122816

Closes 11/13/2026Opened 10/16/2026

California Department of General Services·California

83% match

Project 13751. FTB EVSE. Contract 26-340236

Closes 11/30/2026Opened 10/19/2026

City of Cincinnati – Department of Transportation (DOTE)·Ohio

83% match

EV Charging Rec Centers PID 122816

Closes 11/13/2026Opened 10/27/2026

Lee County·Florida

83% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

City of Tamarac·Florida

83% match

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

Lee County·Florida

83% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

82% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

City of Cincinnati·Ohio

82% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/16/2026

City of Pinole·California

82% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

Lee County·Florida

82% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Massachusetts Department of Transportation·Massachusetts

82% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

California Department of Forestry and Fire Protection·California

82% match

Diesel Exhaust Removal System Installation Services

Closes 11/2/2026Opened 9/30/2026

Port of Stockton·California

82% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

California Department of General Services·California

81% match

CR25-319742.FMD.DataCenterEmergencyGenerator

Closes 11/17/2026Opened 10/6/2026

Port of San Diego·California

81% match

ELECTRICAL RETROFIT OF BAYFRONT PARKING STRUCTURE

Closes 12/1/2026Opened 10/27/2026

Connecticut Energy & Environmental Protection·Connecticut

81% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

Michigan Lansing School District·Michigan

81% match

SO-1862 Electrical Infrastructure/install chargers/bess

Closes 11/12/2026Opened 10/19/2026

Victor Valley Transit Authority·California

81% match

Building Modifications for Hydrogen Fuel Cell Bus Maintenance

Closes 11/19/2026Opened 10/9/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

California State University Long Beach·California

80% match

Parking Lot E8 Repairs

Closes 12/16/2026Opened 10/28/2026