Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›Installation of Two ChargePoint Electric Bus Chargers

Lee County·Florida

Installation of Two ChargePoint Electric Bus Chargers

Closes in 2 days$500k – $1MInvitation for Bid
Get bids like this by emailBid source

Description

Lee County, Florida is seeking a qualified contractor to construct site improvements and install two ChargePoint electric bus chargers at the LeeTran Headquarters (3401 Metro Parkway, Fort Myers). The scope includes demolition, excavation, trenching, concrete pads, protective bollards, pavement restoration, markings, erosion and sediment controls, and all related civil works needed to support the charging infrastructure. Bids must be submitted electronically via IonWave or hand‑delivered by the deadline, and all required pre‑qualification forms, certifications, and insurance documents must accompany the bid. • Project location: LeeTran Headquarters, Fort Myers, FL • Work type: Civil construction and electrical infrastructure for two bus chargers • Key activities: demolition, excavation, trenching, concrete work, pavement restoration, site safety and environmental controls • Funding: Partially or fully funded by the Federal Transit Administration (FTA) – must comply with 2 CFR 200 grant requirements • Mandatory documentation: Sunbiz registration, E‑Verify certification, bid bond, insurance, various compliance affidavits, and FTA “Buy America” certification • Pre‑bid meeting (non‑mandatory): 8 Oct 2026, 11:00 AM (ET) at the project site • Bid submission deadline: 3 Nov 2026, 2:30 PM (ET) • Contact for questions/bids: Sara Long, Procurement Management, (239) 533‑8886, [email protected]

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sara Long

[email protected]

(239) 533-8886

Key dates

Opened
10/2/2026
Questions due
10/26/2026
Pre-bid meeting
10/8/2026
Closes
11/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
B260383SML Addendum 2

Budget estimate

$500,000 – $1,000,000

Based on comparable municipal electric‑vehicle charger projects, a two‑charger installation with associated civil works in a mid‑size Florida city typically ranges from $500,000 to $1,000,000. Costs are driven by site demolition, trenching, concrete pad construction, electrical conduit and wiring, equipment procurement, and compliance with FTA “Buy America” requirements. The estimate assumes standard charger hardware (ChargePoint) and no extraordinary site constraints.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lee County·Florida

Top match · 99%

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

99% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

99% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

City of Fort Myers·Florida

83% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

Lee County·Florida

83% match

North Lee County Phase 3B Well Field Expansion Pipeline & Surface Facilities

Closes 11/12/2026Opened 9/29/2026

Lee County·Florida

83% match

Palm Creek Lower Filter Marsh

Closes 11/5/2026Opened 9/29/2026

City of Long Beach·California

83% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

Lee County·Florida

83% match

Veterans Parks - Electrical Site Lighting

Closes 11/3/2026Opened 10/2/2026

Department of Education·South Carolina

82% match

Electric Bus Charging Stations - Union - Paving

Closes 11/5/2026Opened 10/12/2026

Louisiana Capital Area Transit System·Louisiana

82% match

2222 Florida Terminal Improvement Project

Closes 12/7/2026Opened 10/22/2026

SC Department of Education·South Carolina

82% match

Electric Bus Charging Stations - Newberry - Paving

Closes 11/5/2026Opened 10/13/2026

Leon County Schools·Florida

81% match

Electrical Contractor Services

Closes 12/15/2026Opened 10/15/2026

Palm Beach County·Florida

81% match

Lyons RD N of L30 Canal to Boynton Bch Blvd

Closes 11/3/2026Opened 10/29/2026

City of Long Beach·California

81% match

R-7292 Marine Stadium Electrical Infrastructure

Closes 11/18/2026Opened 10/14/2026

Louisiana Capital Area Transit System (CATS)·Louisiana

80% match

Bus Shelters

Closes 11/16/2026Opened 10/14/2026

Kansas City Area Transportation Authority·Missouri

80% match

Design-Build Battery Electric Bus (BEB) Charging Infrastructure and Canopy

Closes 12/29/2026Opened 11/16/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

Santa Rosa County·Florida

80% match

Madura Five Storm Water Lift Station Rehabilitation Equipment

Closes 11/6/2026Opened 10/7/2026

City of Clearwater·Florida

80% match

Northeast Advanced Pollution Control Facility Install Generator Docking Station at Sand Filter and Reclaim Buildings

Closes 12/16/2026Opened 10/28/2026

City of Pinole·California

80% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

Gulf County Board of County Commissioners·Florida

80% match

Bid #2627-03 CR381 Resurfacing Project

Closes 11/12/2026Opened 10/8/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

Texas City of San Antonio·Texas

80% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Chesterfield - Paving

Closes 11/10/2026Opened 10/14/2026

Escambia County·Florida

80% match

CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility

Closes 11/23/2026Opened 10/23/2026