Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›Installation of Two ChargePoint Electric Bus Chargers

Lee County·Florida

Installation of Two ChargePoint Electric Bus Chargers

Closes in 2 days$500k – $1MInvitation for Bid
Get bids like this by emailBid source

Description

Lee County is seeking a qualified contractor to construct site improvements and install two ChargePoint electric bus chargers at the LeeTran Headquarters in Fort Myers, Florida. The scope includes demolition, excavation, trenching, concrete pads, protective bollards, pavement restoration, markings, erosion and sediment controls, and all associated work needed to support the electric bus charging infrastructure. The project is funded in whole or in part by the Federal Transit Administration, so bidders must comply with 2 CFR Part 200 federal grant requirements. Bids must be submitted electronically via IonWave or hand‑delivered by the deadline, and a non‑mandatory pre‑bid meeting will be held on 10 Oct 2026. • Location: 3401 Metro Parkway, Fort Myers, FL (LeeTran Headquarters) • Work: Site demolition, excavation, trenching, concrete pads, bollards, pavement work, erosion control, and installation of two electric bus chargers • Funding: Federal Transit Administration (FTA) – compliance with 2 CFR 200 required • Bid submission: Electronic (IonWave) or hand‑delivered; sealed bids opened publicly on 11 Nov 2026 • Pre‑bid meeting: 8 Oct 2026 (non‑mandatory) • Required attachments: Sunbiz registration, subcontractor list, various compliance affidavits, bid bond, etc. • Estimated contract value: Not disclosed; typical similar projects range $0.5‑$1 million.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sara Long(Procurement Management)

[email protected]

(239) 533-8886

Key dates

Opened
10/2/2026
Questions due
10/26/2026
Pre-bid meeting
10/8/2026
Closes
11/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
B260383SML Addendum 3

Budget estimate

$500,000 – $1,000,000

The solicitation does not disclose a contract ceiling. Similar municipal electric‑vehicle‑charging projects that include site demolition, trenching, concrete pads, and two high‑power chargers typically fall in the $500,000‑$1,000,000 range, depending on site conditions, material costs, and labor rates. Because the work is federally funded and must meet FTA Buy‑America requirements, the lower end assumes minimal site complications, while the higher end accounts for extensive civil work, permitting, and premium charger equipment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lee County·Florida

Top match · 99%

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

99% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

98% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Department of Education·South Carolina

83% match

Electric Bus Charging Stations - Union - Paving

Closes 11/5/2026Opened 10/12/2026

SC Department of Education·South Carolina

82% match

Electric Bus Charging Stations - Newberry - Paving

Closes 11/5/2026Opened 10/13/2026

City of Fort Myers·Florida

82% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

Lee County·Florida

82% match

Palm Creek Lower Filter Marsh

Closes 11/5/2026Opened 9/29/2026

City of Long Beach·California

82% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

Lee County·Florida

82% match

North Lee County Phase 3B Well Field Expansion Pipeline & Surface Facilities

Closes 11/12/2026Opened 9/29/2026

Lee County·Florida

82% match

Veterans Parks - Electrical Site Lighting

Closes 11/3/2026Opened 10/2/2026

SC Department of Education·South Carolina

81% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Colleton - Paving

Closes 11/10/2026Opened 10/19/2026

Louisiana Capital Area Transit System·Louisiana

80% match

2222 Florida Terminal Improvement Project

Closes 12/7/2026Opened 10/22/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

Leon County Schools·Florida

80% match

Electrical Contractor Services

Closes 12/15/2026Opened 10/15/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Chesterfield - Paving

Closes 11/10/2026Opened 10/14/2026

Palm Beach County·Florida

80% match

Lyons RD N of L30 Canal to Boynton Bch Blvd

Closes 11/3/2026Opened 10/29/2026

Kansas City Area Transportation Authority·Missouri

80% match

Design-Build Battery Electric Bus (BEB) Charging Infrastructure and Canopy

Closes 12/29/2026Opened 11/16/2026

Birmingham-Jefferson County Transit Authority·Alabama

80% match

BUS STOP SIGNAGE REPLACEMENT PROJECT

Closes 11/12/2026Opened 10/9/2026

City of Long Beach·California

80% match

R-7292 Marine Stadium Electrical Infrastructure

Closes 11/18/2026Opened 10/14/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Chesterfield - Electrical

Closes 11/10/2026Opened 10/13/2026

Louisiana Capital Area Transit System (CATS)·Louisiana

79% match

Bus Shelters

Closes 11/16/2026Opened 10/14/2026

Santa Rosa County·Florida

79% match

Madura Five Storm Water Lift Station Rehabilitation Equipment

Closes 11/6/2026Opened 10/7/2026

Miami-Dade County Department of Transportation and Public Works·Florida

79% match

Cow Pen Rd. at Miami Lakes Dr.

Closes 12/9/2026Opened 10/30/2026

City of Pinole·California

79% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026