Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›Installation of Two ChargePoint Electric Bus Chargers

Lee County·Florida

Installation of Two ChargePoint Electric Bus Chargers

Closes in 2 days$500k – $1.5MInvitation for Bid
Get bids like this by emailBid source

Description

Lee County, Florida is seeking a qualified contractor to construct site improvements and install two ChargePoint electric bus chargers at the LeeTran Headquarters (3401 Metro Parkway, Fort Myers). The scope includes demolition, excavation, trenching, concrete pads, protective bollards, pavement restoration and markings, erosion and sediment controls, and all associated civil works needed to support the chargers. The project is funded partially or wholly by the Federal Transit Administration, so all bidders must comply with 2 CFR part 200 federal grant requirements. Bids must be submitted electronically via IonWave or hand‑delivered by the close date, and a non‑mandatory pre‑bid meeting is scheduled for 10 Oct 2026. The contract will be awarded to the lowest responsive and responsible bidder. • Location: LeeTran Headquarters, Fort Myers, FL • Work: demolition, excavation, trenching, concrete equipment pads, bollards, pavement work, erosion control, and installation of two EV bus chargers • Funding: Federal Transit Administration (FTA) – federal grant compliance required • Submission: sealed bids via IonWave or hand‑delivery by 02:30 PM ET on 3 Nov 2026 • Pre‑bid meeting: 8 Oct 2026 (non‑mandatory) • Required attachments: Sunbiz registration, bid bond, various certifications, and compliance forms

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sara Long

[email protected]

(239) 533-8886

Key dates

Opened
10/2/2026
Questions due
10/26/2026
Pre-bid meeting
10/8/2026
Closes
11/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
B260383SML

Budget estimate

$500,000 – $1,500,000

Based on typical costs for civil works (demolition, excavation, concrete pads, trenching) plus the procurement and installation of two high‑capacity ChargePoint bus chargers, a comparable project in Southwest Florida ranges from roughly $500,000 for a minimal scope to $1,500,000 for a more extensive site‑prep and higher‑spec equipment package. Factors influencing the final amount include site conditions, utility upgrades, local labor rates, and any additional permitting or environmental mitigation required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lee County·Florida

Top match · 99%

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

99% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

99% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

82% match

Palm Creek Lower Filter Marsh

Closes 11/5/2026Opened 9/29/2026

City of Long Beach·California

82% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

City of Fort Myers·Florida

82% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

Department of Education·South Carolina

82% match

Electric Bus Charging Stations - Union - Paving

Closes 11/5/2026Opened 10/12/2026

Lee County·Florida

82% match

Veterans Parks - Electrical Site Lighting

Closes 11/3/2026Opened 10/2/2026

Lee County·Florida

82% match

North Lee County Phase 3B Well Field Expansion Pipeline & Surface Facilities

Closes 11/12/2026Opened 9/29/2026

SC Department of Education·South Carolina

82% match

Electric Bus Charging Stations - Newberry - Paving

Closes 11/5/2026Opened 10/13/2026

Louisiana Capital Area Transit System·Louisiana

81% match

2222 Florida Terminal Improvement Project

Closes 12/7/2026Opened 10/22/2026

Leon County Schools·Florida

81% match

Electrical Contractor Services

Closes 12/15/2026Opened 10/15/2026

Palm Beach County·Florida

80% match

Lyons RD N of L30 Canal to Boynton Bch Blvd

Closes 11/3/2026Opened 10/29/2026

SC Department of Education·South Carolina

80% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

Santa Rosa County·Florida

80% match

Madura Five Storm Water Lift Station Rehabilitation Equipment

Closes 11/6/2026Opened 10/7/2026

Kansas City Area Transportation Authority·Missouri

80% match

Design-Build Battery Electric Bus (BEB) Charging Infrastructure and Canopy

Closes 12/29/2026Opened 11/16/2026

Louisiana Capital Area Transit System (CATS)·Louisiana

80% match

Bus Shelters

Closes 11/16/2026Opened 10/14/2026

City of Long Beach·California

80% match

R-7292 Marine Stadium Electrical Infrastructure

Closes 11/18/2026Opened 10/14/2026

SC Department of Education·South Carolina

79% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

Birmingham-Jefferson County Transit Authority·Alabama

79% match

BUS STOP SIGNAGE REPLACEMENT PROJECT

Closes 11/12/2026Opened 10/9/2026

City of Pinole·California

79% match

Design Services for Electric Vehicle Charging Infrastructure for the City of Pinole

Closes 11/4/2026Opened 10/7/2026

City of Clearwater·Florida

79% match

Northeast Advanced Pollution Control Facility Install Generator Docking Station at Sand Filter and Reclaim Buildings

Closes 12/16/2026Opened 10/28/2026

Department of Education·South Carolina

79% match

Electric Bus Charging Stations - Colleton - Paving

Closes 11/10/2026Opened 10/19/2026

Gulf County Board of County Commissioners·Florida

79% match

Bid #2627-03 CR381 Resurfacing Project

Closes 11/12/2026Opened 10/8/2026

SC Department of Education·South Carolina

79% match

Electric Bus Charging Stations - Chesterfield - Paving

Closes 11/10/2026Opened 10/14/2026