Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Multiple Marina Piling Replacement - South of SW 120th St…

Miami-Dade County·Florida

Multiple Marina Piling Replacement - South of SW 120th St to County Line

Closes 6/25/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This Contract is intended to provide services on an as-needed basis across multiple locations within Miami Dade County Park Facilities, as may be requested by the Owner. This is a blanket project which is work order driven. The RPQ term shall be three hundred sixty-five (365) calendar days, or until the not-to-exceed contract allocation is fully expended, whichever occurs first. The purpose of this solicitation is to establish a contract for the replacement of Marine Pilings, with Pearson Fiberglass Composite (Brown in color) or approved equal. This contract will be replacing existing pilings throughout all of Miami Dade County Parks and Recreation Marinas within South of SW 120th St to County Line. 1 CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade County Park & Recreation Construction Division for work to be completed. Furnish all labor, equipment and materials required. 2 Contractor shall be responsible for attaining all pertinent permits from any and all governing entities (i.e., City of Miami, Miami-Dade RER, Electrical, Plumbing, Miami-Dade Public Works, Miami-Dade Water & Sewer, DERM, Fire, FDEP, Florida Department of Health, South Florida Water Management, US Army Corps of Engineers, Florida Department of Environmental Protection, USCG etc.) needed to begin and complete all phases of work. 3 If applicable, prior to starting project, CONTRACTOR shall notify any departments having jurisdiction of the work being performed. 4 CONTRACTOR shall comply with Office of Resilience initiatives, to include Sea Level Rise. 5 Contractor shall coordinate all required inspections/tests and documentation required by any/all governing entities, i.e., City of Miami, Miami-Dade Building Department, etc. 6 It shall be the contractor’s responsibility to ensure that all required regulatory or proprietary permits are obtained prior to commencement of work. 7 Contractor shall use silt barrier, turbidity barriers or any other form of erosion control necessary to avoid contaminating boat basin area. 8 All new pilings being installed shall be Pearson Fiberglass Composite or equivalent. All substitutions shall be submitted to the Miami Dade County Project Manager. 9 Due to sea level rise, all new pilings shall be raised up 3 feet above existing pilings’ elevation. 10 The contractor shall notify the project manager prior to starting the job. 11 All new Fiberglass Composite being installed shall be the approximate diameter as existing wood pilings. Existing size to be identified and new piling size shall be approved prior to installation. 12 Contractor shall complete site visit for inspection of existing damage square pile for replacement to match existing in size, dimension, and structural bearing specifications with same materials. 13 All new pilings shall be driven to equal/greater depth of existing pilings being removed to prevent leaning, swaying, twisting, etc. 14 Piles which require excessive bending to straighten shall be withdrawn and re-installed to the proper vertical upright position. (Piles shall not be installed and then pulled into position). 15 Contractor shall be required during installation of new piling to be monitored by pile driving report/records submitted by location to ensure minimum driving resistance, record of depth to existing pilings which were removed, record total length to include above ground height/elevation to equal depth/embedment. All requests for information (RFI) must be submitted in writing by 06/15/2026 to [email protected] and copy the Clerk of the Board at [email protected]. NO PHONE CALLS WILL BE ACCEPTED. Verbal statements made by the County or the Owner’s Representative that are not contained in an RPQ or addendum to the RPQ are not binding on the County and should not form any basis for a bidder’s response to an RPQ. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
5/22/2026
Closes
6/25/2026

Last updated

Details

Industry
Construction
NAICS
237990

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Miami-Dade County·Florida

Top match · 78%

Multiple Marina Construction and Repairs - South of SW 120th St to County line

Closes 11/10/2026Opened 10/22/2026

Miami-Dade County·Florida

76% match

Multiple Marina Construction and Repairs - Central of Tamiami Trail to SW 120th Street

Closes 11/10/2026Opened 10/22/2026

Miami-Dade County·Florida

76% match

Multiple Marina Construction and Repairs - South of SW 120th St to County line

Closes 11/10/2026Opened 9/15/2025

Miami-Dade County·Florida

75% match

Multiple Marina Construction and Repairs - North of Tamiami Trail to the County line

Closes 11/10/2026Opened 10/22/2026

Miami-Dade County·Florida

72% match

Multiple Marina Construction and Repairs - North of Tamiami Trail to the County line

Closes 11/10/2026Opened 9/15/2025

Miami-Dade County·Florida

71% match

Multiple Marina Construction and Repairs - Central of Tamiami Trail to SW 120th Street

Closes 11/10/2026Opened 9/15/2025

New York City Department of Parks & Recreation·New York

70% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

City of Key West·Florida

70% match

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

U.S. Department Of The Interior·Colorado

69% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

Erie County·New York

69% match

ERIE COUNTY SEWER DISTRICT NO. 1 FRENCH ROAD AT RANDY WAY SANITARY SEWER REPLACEMENT CONTRACT NO. 52

Closes 11/17/2026Opened 10/13/2026

City and County of San Francisco·California

69% match

EXT REC | CON27-0001 Marina Dredging - RFQ SFFirst

Closes 12/31/2026Opened 7/14/2026

Marinette County·Wisconsin

69% match

RFB #26-015-34 - Law Enforcement Center Roof Replacement

Closes 11/16/2026Opened 9/29/2026

State of Hawaii Department of Transportation – Harbors Division·Hawaii

68% match

P10904 Domestic & Fire Waterline Systems Replacement Pier 51A

Closes 12/3/2026Opened 10/8/2026

City of Lake City and City of Bellechester·Minnesota

68% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

New York City Department of Parks and Recreation·New York

68% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/19/2026Opened 10/16/2026

Snohomish County·Washington

68% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

Ohio Department of Natural Resources·Ohio

68% match

Shawnee Marina Seawall Slip

Closes 11/19/2026Opened 10/26/2026

U.S. Department Of The Interior·California

68% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

Goodwyn Mills Cawood·Alabama

68% match

County Road 64 Water Line Relocation for the Belforest Water System

Closes 11/19/2026Opened 10/14/2026

City and County of San Francisco·California

68% match

EXT REC | CON26-0014 Marina Seawall - MLBE

Closes 12/31/2027Opened 1/16/2026

Maryland Port Administration·Maryland

68% match

Sand Filter Repairs and Improvements at South Locust Point Marine Terminal

Closes 11/18/2026Opened 8/27/2026

County of Accomack·Virginia

68% match

IFB 775 - Parker Creek Dock and Ramp

Closes 11/4/2026Opened 10/14/2026

Cape May County Municipal Utilities Authority·New Jersey

68% match

CONTRACT WW-41-26 Ocean City Region 3rd St & Seven Mile Beach/Middle Region 39th St Pump Stations

Closes 11/24/2026Opened 10/27/2026

County of Collier, FL·Florida

67% match

Beach Maintenance and Related Activities

Closes 11/12/2026Opened 10/9/2026

Bay County·Florida

67% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026