Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›3289L South Boulevard 2745 Zone Reservoir Inlet/Outlet…

Nevada Government·Nevada

3289L South Boulevard 2745 Zone Reservoir Inlet/Outlet Pipeline

Closes 8/25/2026$25M – $30MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Las Vegas Valley Water District is seeking qualified contractors to design and construct a new water transmission pipeline in the Las Vegas Valley. The scope includes installing approximately 18,000 linear feet of 42‑inch‑diameter mortar‑lined, tape‑wrapped, and mortar‑coated steel pipe, laying fiber‑optic conduit and related communications infrastructure, constructing four 42‑inch butterfly valve vaults, installing a sacrificial‑anode cathodic protection system, and performing associated electrical and communications upgrades. Additional work involves removal of an existing 12‑inch gate valve and replacement with a 12‑inch butterfly valve at the 2860 Zone South Pumping Station, as well as various site‑specific stabilization, dust‑control, and environmental mitigation measures required by BLM easements and permits. The engineer’s estimate for the project is $28,203,225.00. • 18,000 ft of 42‑in. mortar‑lined steel pipe with tape‑wrap and mortar coating • Fiber‑optic conduit, pull boxes, and communications appurtenances along the pipe route • Four 42‑in. butterfly valve vaults with concrete enclosures and cathodic protection • Replacement of a 12‑in. gate valve with a butterfly valve at the 2860 Zone South Pumping Station • Electrical and communications upgrades for new valve installations • Environmental mitigation: seed mix, biologist monitoring, cacti/yucca salvage, dust‑palliative, final stabilization, and spoil disposal per BLM and local permits • Project located across Clark County and City of Henderson jurisdictions, intersecting BLM grants, private and patent easements • Engineer’s cost estimate: $28.2 M; bid opening 8/25/2026 via Microsoft Teams

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chetan Champaneri(Senior Purchasing Analyst)

[email protected]

(702) 258-3849

Key dates

Opened
7/28/2026
Questions due
8/20/2026
Pre-bid meeting
8/4/2026
Closes
8/25/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
010323 Addendum 2

Budget estimate

$25,000,000 – $30,000,000

The engineer’s estimate for the full scope is $28,203,225. Assuming typical bid‑to‑award adjustments (contingencies, overhead, profit), the contract value is likely to fall within a $25 M to $30 M range. Factors influencing the final amount include the final design specifications, any change orders for environmental mitigation, and the selected contractor’s pricing strategy.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Redlands·California

Top match · 65%

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of DeLand·Florida

65% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Beaumont·California

65% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Imperial Irrigation District·California

64% match

East Highline Reservoir Project

Closes 12/2/2026Opened 9/10/2026

The Village of Royal Palm Beach·Florida

64% match

SR80 Irrigation Boring

Closes 11/13/2026Opened 10/30/2026

City of DeLand·Florida

63% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

West County Wastewater·California

63% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Riverside·California

63% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of San Bernardino·California

63% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Shawnee·Kansas

63% match

Ordinance No. 3479

Closes 1/16/2029Opened 1/16/2024

Mississippi

63% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

U.S. Department Of Defense·California

63% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

63% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of The Interior·Utah

62% match

EAST CANAL EFFICIENCY IMPROVEMENTS

Closes 11/20/2026Opened 9/4/2026

Eastern Municipal Water District·California

62% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

Massachusetts Town of Westborough·Massachusetts

62% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Tarrant Regional Water District·Texas

62% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of Philadelphia·Pennsylvania

62% match

PW Bid 2918 -Relay of water mains and construction of GSI in 26th St from W. Clearfield St.

Closes 11/5/2026Opened 10/14/2026

City of Philadelphia·Pennsylvania

62% match

PW Bid 2917 - SEWER RECONSTRUCTION and RELAY of WATER MAINS in BROOKLYN ST from ASPEN ST

Closes 11/5/2026Opened 10/14/2026

Fort Bend County Municipal Utility District No. 134A·Texas

62% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026

St. Lucie County - Purchasing Department·Florida

62% match

Avenue M New Entrance Road & Stormwater Pipeline Relocation at Harbour Pointe

Closes 11/18/2026Opened 10/4/2026

City of Tampa, Florida·Florida

62% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

City of Fargo·North Dakota

62% match

City of Fargo RFP - Engineering Services: Project No. SR-28-A0 Project No. SN-28-A0 Project No. SN-29-A0

Closes 11/13/2026Opened 10/17/2026

San Francisco Water Power Sewer·California

62% match

WD-2914 Bay Division Pipelines Nos. 1 Through 4 Lining and As-Needed Pipeline Repairs

Closes 11/19/2026Opened 10/8/2026

New York Department of Environmental Protection·New York

62% match

82627Y0899-DEL-465

Closes 11/6/2026Opened 9/28/2026