The City of Laguna Niguel, on behalf of four Orange‑County cities, is seeking a qualified contractor to design, install, and commission a comprehensive traffic‑signal synchronization and communications upgrade along the Alicia Parkway corridor. The work includes replacement/upgrade of traffic‑signal controllers, installation of CCTV cameras, deployment of fiber‑optic cable networks, UPS power‑backup units, Ethernet switches, vehicle‑detection systems, accessible pedestrian signal assemblies, and associated civil works such as conduit, pull boxes, and splice enclosures. The contract will be awarded to the lowest responsive and responsible bidder, with a construction period of 180 working days after notice to proceed.
• Upgrade and program new traffic‑signal controllers (e.g., Q‑Free, Econolite) at dozens of intersections across Laguna Niguel, Aliso Viejo, Laguna Hills, and Mission Viejo.
• Install a fiber‑optic communications backbone (single‑mode fiber, splice cabinets, patch panels) linking all signal cabinets and the traffic‑management center.
• Provide related infrastructure: UPS units, CCTV cameras, Ethernet switches, detector (VDS/Radar) units, and accessible pedestrian signal devices, together with testing, commissioning, and training.