This design‑build project replaces the existing Lewis Road bridge over Spring Fork in Madison County, Ohio. The contractor will be responsible for complete demolition of the existing structure, earthwork, new substructure and superstructure (a prestressed concrete box‑beam bridge), roadway paving, drainage, guardrail installation, utility coordination, environmental compliance, and full as‑built documentation. The scope includes design services, permitting, and a mandatory 9 % Small Business Enterprise participation goal, with performance‑bond, bid‑bond, and prevailing‑wage requirements.
• Design‑build delivery: single contract covering design, permitting, construction, and close‑out.
• Full bridge replacement (≈ 51 ft span, 28 ft roadway) plus minor approach work, drainage, and traffic‑control (MOT).
• Project must be completed no later than 30 Sept 2027; construction may not begin before 1 June 2027 without written approval.
• Contractor must be pre‑qualified per ODOT PN 126, provide 100 % performance bond, hold Davis‑Bacon prevailing‑wage rates, and meet a 9 % SBE participation goal.