Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›Central Business District Wayfinding

City of Richland·Washington

Central Business District Wayfinding

Closes 5/28/2026$80k – $95kRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Richland is seeking a consultant to develop a comprehensive wayfinding master plan for the Central Business District (CBD) and multimodal transportation. The plan should include citywide implementation options and establish a flexible system that can be expanded over time. The selected consultant will develop standards and design guidelines that are scalable, replicable, and adaptable for implementation in other districts and corridors throughout the city. Key responsibilities include assessing existing conditions, evaluating user needs, developing a cohesive wayfinding framework, and providing conceptual design materials. The project is expected to be completed within five months, and the City estimates the cost to be between $80,000 and $95,000. • The wayfinding system should primarily serve the CBD while recognizing its connection to the broader community. • The plan should include directional signage within the CBD that references destinations outside the district. • The study should also include key entry points to the city guiding people to and around the CBD. • The consultant should develop a phased implementation approach for the CBD and a scalable implementation strategy for expanding the wayfinding program citywide. • The consultant should provide planning-level cost estimates and recommend a maintenance strategy for the wayfinding system.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Barb Raney(Purchasing Division)

[email protected]

(509) 942-7710

Key dates

Opened
5/10/2026
Questions due
5/18/2026
Closes
5/28/2026
Duration
5 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
925120
Solicitation №
26-0037

Budget estimate

$80,000 – $95,000

The City estimates the cost for this project to be between $80,000 and $95,000. This estimate is based on the scope of work, which includes developing a comprehensive wayfinding master plan, assessing existing conditions, evaluating user needs, and providing conceptual design materials. The budget amount will likely depend on the consultant's experience, qualifications, and proposed approach to the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Riverside·California

Top match · 61%

Wayfinding Application Services

Closes 12/9/2026Opened 10/28/2026

Goodwyn Mills Cawood·Alabama

57% match

Wayfinding Signage Downtown Montgomery PROJECT NO. SP-5-26

Closes 11/17/2026Opened 10/7/2026

City of Edmond·Oklahoma

55% match

Downtown Edmond Master Plan

Closes 2/1/2027Opened 10/23/2026

Southern California Regional Rail Authority·California

54% match

Systemwide Signage and Wayfinding Master Plan

Closes 12/2/2026Opened 10/29/2026

NYS Alden, Town of·New York

53% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

LA Public Works Engineering Bureau·California

53% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Harrisonburg·Virginia

53% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

City of Shawnee·Kansas

53% match

Ordinance No. 3491

Closes 6/11/2029Opened 6/10/2024

City of Cincinnati·Ohio

52% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Lancaster·Texas

52% match

Truck Route Study

Closes 11/18/2026Opened 10/14/2026

City of Cincinnati·Ohio

52% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

City of Lancaster·Texas

52% match

Truck Route Study

Closes 11/18/2026Opened 10/14/2026

City of Lancaster·Texas

52% match

Truck Route Study

Closes 11/18/2026Opened 10/14/2026

City of Pittsburgh·Pennsylvania

52% match

Creative Strategist: City of Pittsburgh

Closes 11/13/2026Opened 10/1/2026

City of Charlotte·North Carolina

52% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Missouri Department of Transportation·Missouri

52% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Rancho Cordova·California

52% match

Rancho Cordova Complete Streets Implementation Guide

Closes 11/13/2026Opened 10/9/2026

City of Hesperia·California

52% match

City of Hesperia Vision Zero Action Plan and Supplemental Complete Streets Plan

Closes 11/17/2026Opened 9/30/2026

Missouri Department of Transportation·Missouri

52% match

Central District, City of Linn Creek, sidewalk improvements to West Valley Drive

Closes 11/5/2026Opened 9/30/2026

City of Charlotte·North Carolina

52% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

City of Fayetteville, Georgia·Georgia

52% match

RFQ PZ740-01: SR54/SR85 Downtown Traffic Engineering and Walkability Study

Closes 12/3/2026Opened 10/28/2026

Parkland Health & Hospital System·Texas

52% match

RFP#1993189- MATOC_Wayfinding & Signage

Rolling / TBD closeOpened 1/1/2017

Missouri Department of Transportation·Missouri

52% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Helena·Montana

52% match

East Side Arterial Connector Build Grant Project TSD-26-14

Rolling / TBD closeOpened 3/31/2026

City of Goshen, Indiana·Indiana

52% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026