Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Civil Engineering
  5. ›MS-220015C Pump Stations 44 & 45 Abandonment

City of Lawrence·Kansas

MS-220015C Pump Stations 44 & 45 Abandonment

Closes 9/29/2026$1.5M – $3.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Lawrence is soliciting bids for the complete abandonment of Pump Stations 44 and 45 and extensive sanitary sewer improvements. The work includes installing new PVC sewer lines (approximately 2,998 linear feet of various diameters), constructing and rehabilitating manholes, temporary pumping, dam evaluation and restoration, stream crossing restorations, and full site restoration. The contractor must also remove existing pump‑station equipment, abandon associated piping and valves, and restore the site per the drawings. The contract requires performance and payment bonds, compliance with Kansas anti‑discrimination statutes, and adherence to extensive technical specifications covering grading, trenching, concrete, asphalt, erosion control, and landscaping. Substantial completion is required by May 15 2027, with final completion by September 17 2027. Bids are due electronically by 3:30 p.m. on September 22 2026; a pre‑bid meeting/site visit is scheduled for September 3 2026. • Scope: ~3,000 LF of new sewer pipe (21”, 16”, 15”, 10”), 14 manholes, epoxy rehabilitation, stream crossings, dam work, pump‑station de‑commissioning. • Location: City of Lawrence, KS (project site at various municipal rights‑of‑way). • Schedule: Pre‑bid 9/3/2026, Q&A deadline 9/11/2026, bid deadline 9/22/2026, substantial completion 5/15/2027, final completion 9/17/2027. • Bonds: 5 % bid bond, performance, maintenance, and statutory bonds required. • Compliance: Kansas Act Against Discrimination, environmental permits, and city technical specifications.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Caroline Bridgewater(Procurement Division)

[email protected]

(785) 813-3390

Key dates

Opened
8/24/2026
Questions due
9/11/2026
Pre-bid meeting
9/3/2026
Site visit
9/3/2026
Closes
9/29/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
CIFB-2600028

Budget estimate

$1,500,000 – $3,500,000

The bid package covers extensive new pipe installation, manhole construction/rehabilitation, pump‑station de‑commissioning, and environmental restoration. Based on typical municipal sewer construction costs (≈ $150‑$250 per linear foot for PVC pipe plus $10‑$20 k per manhole and $500‑$1,000 k for site restoration), the total contract value is likely in the low‑to‑mid multi‑million range. A conservative low estimate is about $1.5 M, while a high‑end scenario (including extensive environmental mitigation) could approach $3.5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 66%

29--PUMP,FUEL,METERING AND

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

66% match

43--PUMP UNIT,ROTARY

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Washington

65% match

43--PUMP,ROTARY

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·California

65% match

43--PUMPING UNIT,CLEAR WAT

Closes 11/1/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

65% match

29--PUMP,FUEL,METERING AND

Closes 11/4/2026Opened 10/21/2026

Miami‑Dade County Water & Sewer Department·Florida

65% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

65% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

City of Cincinnati·Ohio

65% match

Camargo Canyon Pump Station Elimination (10270026)

Closes 11/10/2026Opened 10/8/2026

City of Cincinnati·Ohio

65% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/5/2026Opened 9/17/2026

City of Cincinnati·Ohio

65% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

U.S. Department Of Defense·United States of America

64% match

43--PUMP UNIT,ROTARY

Closes 11/4/2026Opened 10/25/2026

City of Hilliard, Ohio·Ohio

64% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Defense·Maine

64% match

43--HOUSING,LIQUID PUMP

Closes 11/17/2026Opened 10/7/2026

City of Branson·Missouri

64% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

64% match

43--PUMP UNIT,ROTARY

Closes 11/1/2026Opened 10/20/2026

Jackson County Utility Authority·Mississippi

64% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

U.S. Department Of Defense·North Carolina

64% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

Town of Babylon·New York

64% match

BID# 26G53 - CONSTRUCTION OF AUXILIARY PUMP & PUMP STATION AT CELL 7

Closes 11/5/2026Opened 10/21/2026

Upper Occoquan Service Authority·Virginia

64% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Fort Myers·Florida

64% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

Gwinnett County Government·Georgia

63% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026