The Garvey Reservoir Rehabilitation Stage 1 project involves the removal, disposal, and replacement of the existing membrane liner and floating cover system, reinforcement of the outlet tower, demolition of a portion of the existing 51-inch diameter pipe and corresponding outlet structure, construction of a new 51-inch diameter pipe and outlet structure, installation of new electrical duct banks and various electrical upgrades, replacement of mechanical equipment and instrumentation and controls, and other appurtenant work. The project requires a contractor to perform the work, which includes asbestos abatement, lead paint removal, and other hazardous material handling. The contractor must also comply with the Project Labor Agreement (PLA) and meet the requirements for small and disabled veteran business participation.
• The project involves the replacement of the existing membrane liner and floating cover system.
• The outlet tower will be reinforced, and a portion of the existing 51-inch diameter pipe and corresponding outlet structure will be demolished.
• A new 51-inch diameter pipe and outlet structure will be constructed.
• New electrical duct banks and various electrical upgrades will be installed.
• Mechanical equipment and instrumentation and controls will be replaced.
• The project requires compliance with the Project Labor Agreement (PLA) and meets the requirements for small and disabled veteran business participation.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.